50 www. refrigerationandaircon. co. za RACA Journal I November 2026
CERTIFICATION voices
• Annual FPC surveillance audit – the notified body returns to the factory every year to audit the FPC system. This is where ongoing compliance either holds or quietly lapses.
The document that confirms all three elements together is the certificate of constancy of performance, issued only by a notified body designated under the CPR specifically for EN 12101-3.
Bodies currently recognised for EN 12101-3 work include BSI Group( UK, NB 0086), Applus + Laboratories( Spain, NB 0370), Kiwa N. V.( Netherlands, NB 0200), Efectis Group( France / Netherlands, NB 1316 / 0432) and IFI Institut für Industrieaerodynamik( Germany), among others. This list is not exhaustive – always verify current designation directly against the NANDO database rather than relying on a static list.
THREE DOCUMENTS, THREE DIFFERENT THINGS Manufacturers may present several documents in response to a certification request. Knowing what each one actually confirms – and doesn ' t – matters before it goes onto a specification.
Document Issued by What it
ISO 9001 certificate
Type test report
Certificate of Constancy of Performance
Declaration of Performance
Any accredited QMS body
Accredited test laboratory
CPR Notified Body only
Manufacturer( self-declared) confirms A quality management system is in place The tested sample passed thermal endurance testing Type test, consistent production, and current annual audits, together Conformance— meaningful only alongside a current CPR certificate
Sufficient alone? No
No
Yes
With CPR certificate only
NOT EVERY NOTIFIED BODY DESIGNATION IS THE SAME A body can be a perfectly legitimate notified body under EU law and still be the wrong one for this purpose. Designations are scope-specific: a body accredited under the Medical Devices Regulation, the Radio Equipment Directive, or the PPE Directive has no standing to certify smoke and heat control fans, regardless of its reputation in its own field. Before accepting a certificate, confirm the issuing body is designated specifically under the CPR for EN 12101-3, and check that designation against the European Commission ' s NANDO-CPR database.
A SHORT CHECKLIST FOR THE SPECIFICATION FILE Before a smoke fan motor goes onto a South African project specification, it ' s worth working through four questions with the manufacturer, in writing, and keeping the answers in the project O & M file:
• Certificate type and issuer – is this a genuine certificate of constancy of performance from a CPR-designated notified body, not merely a type test report or ISO 9001 certificate? Does it state the temperature class( F200 / F300 / F400) matching the project requirement?
• Audit currency – when was the last FPC surveillance audit, was it within the last 12 months, and was it conducted by the same notified body that issued the certificate?
• Product match – does the declaration of performance reference the certificate, and does it cover the exact model, size, motor type and configuration being supplied? Any motor substitution requires re-testing of the complete assembly.
• Records – are copies of the certificate, DoP and latest audit confirmation held in the project file, and – where multiple factories are involved – does each hold its own certification?
WHERE SOUTH AFRICA FITS IN SANS 10400-T references EN 12101( all parts) as the normative standard for smoke and heat control systems. South Africa does not enforce the EU CPR as domestic law, but EN 12101-3 certification remains the accepted market benchmark, and compliance is driven by project specification. Fire engineers and specifiers are entitled – and well advised – to demand a valid certificate of constancy of performance, and confirmation of a current FPC audit, before any smoke fan motor is accepted onto a specification.
Certification that looks right on the cover page doesn ' t always hold up once you ask what ' s actually behind it. A few direct questions at tender stage cost little and protect a great deal – both the integrity of the fire strategy and, ultimately, the people relying on it in an emergency. RACA
REFERENCES:
1. EN 12101-3:2015- Smoke and heat control systems, Part 3: Specification for powered smoke and heat exhaust ventilators.
2. EU Construction Products Regulation( CPR) 305 / 2011, Assessment and Verification of Constancy of Performance( AVCP) System 1.
3. European Commission NANDO-CPR database( Notified Bodies), webgate. ec. europa. eu / single-market-compliance-space / notified-bodies.
4. SANS 10400-T: 2011- The application of the National Building Regulations, Part T: Fire protection.
50 www. refrigerationandaircon. co. za RACA Journal I November 2026