RACA Journal January 2019 | Page 76

Smoke exhaust – it’s serious maintenance engineer; this can render the entire system unserviceable, depending on where the cable fault occurs. Cognisance of all possible system faults must be addressed when selecting equipment and components to deliver a working SHEVS system. One would never try to fill a 150mℓ wine glass with a 750mℓ bottle of wine; how is it possible for a designer to select a 12-amp panel to power a 16-amp ventilator load? It does not have any bearing on the information produced by the supplier indicating internal testing regimes. The panel needs to be certified to meet the claims made. Live system testing in a workshop is not comparable to testing in a certified test house. The impact is worse when making assumptions without certification when it comes to large- scale fan exhaust systems where cable performance in live commissioning tests at ambient temperatures negate the effect of elevated temperatures on the current-carrying capacity of the same cable at elevated temperatures. The excessive volt drop impedes current flow, which causes excessive lower voltage being supplied to the motor, 74 RACA Journal I January 2019 resulting in motor failure. Caution and diligence are required for all things electrical. Cognisance of all possible system faults must be addressed when selecting equipment and components to deliver a working SHEVS system. Every system designer should safeguard against equipment without certified documentation supporting the claims relating to the equipment performance. Time constraints leading to hasty, inadequately researched solutions always find enough time to nitpick at decisions made, after an event. Additional time spent ensuring fit for purpose, suitably certified equipment saves disasters from occurring and hours of unproductive time. RACA www.hvacronline.co.za