RACA Journal January 2019 | Page 75

Smoke exhaust – it’s serious looking into the electrical aspects of the systems — it is time to explore EN 12101 Part 10. The important aspect with electrically powered equipment required to operate in a fire condition is the requirement for the electrical current to be supplied to the equipment. Yes, it sounds obvious; however, insufficient attention is often paid to this aspect of the system. The selection of the control panel is not an isolated decision — the requirement exists for the control panel to suit the equipment being powered. The SHEVS equipment manufacturer needs to give the panel designer sufficient information to ensure that the equipment can be operated in an emergency situation. Matching equipment that works as certified is critical to a successful system. 4.1 General If a smoke and heat control system fails to the fire operational position on loss of power, only one power source shall be required. For non-fail-safe smoke and heat control systems there shall be at least two power sources: the primary power source and the secondary power source. The primary power source shall be designed to operate from the public electricity supply or an equivalent system. The secondary power source, for example batteries of a generator, shall be permanently available, tested and maintained. [EN 12101-10: 2006; p. 10] 6. 2.2 Note 1: To allow for possible failures of equipment or of the incoming mains supply, the secondary supply should be capable of maintaining the system in operation for at least 72h, unless provision is made for immediate notification of failure, either by local or remote supervision of the system, and a repair contract is in force giving a maximum repair period of less than 24h. In this case the minimum standby capacity may be reduced from 72h to 30h or may be further reduced to 4h if spares, repair personnel and a standby generator are available on site at all times. Note 2: At the end of the maximum standby period if dead lock is required, the residual power should be capable of operating the system (including deadlock) in accordance with the requirements of EN 12101-9. [EN 12101-10: 2006; p. 15] Every system designer should safeguard against equipment without certified documentation supporting the claims relating to the equipment performance. Should the system designer select fail-safe equipment, it should be noted that fusible link ventilators do not meet the requirements of ‘fail safe’ — there is no requirement for a secondary power source. Fail safe come with their own set of unique challenges and are no longer the first-choice solution for most designers. The installation of power closed / power open ventilators has many challenges, which we discover as we work through this portion of the code. A pertinent question would be the integrity of the electrical reticulation system between the SHEVS control panel and the ventilator’s actuators. It is important when solving a problem, that associated new problems relating to power closed / power open systems are not ignored. Batteries and generators forming part of the secondary power source must comply with the code requirements. Part 10 delves into the requirements relating to pneumatic systems, which do not form part of this topic. In South Africa, pneumatic ventilators are seldom a requirement; I am not aware of a locally produced EN 12101:2-certified ventilator in South Africa. www.hvacronline.co.za I want to explore this somewhat: Should a power failure occur and the actuators on the ventilators are isolated, is the control panel consuming power? The panel is definitively consuming power, but this does not mean that the secondary power source, if batteries, are not being discharged. The electrical control consumes power once the system goes live. The internal control circuit constantly monitors the fire signal, LEDs consume micro amounts of power, and the batteries drain. All these possible scenarios form part of the certification and testing. The designer needs to ensure diligence when specifying; checking during commissioning that the system contains all the correctly specified components and plug-in items — as an example, batteries when the certification was achieved. Every certificate issued comes with a complete set of detailed certified results, which give a complete equipment and component breakdown of the certified product. All claims relating to current usage and performance after the 72-hour ‘power off’ scenario are detailed and tested; this requires checking before specifying. If the supplier is unwilling/unable to produce the test results and the components tested, the designer will struggle to mitigate his or her decision to use the equipment as part of the SHEVS system. Addressing the monitoring of the cabling going into the field should be a question raised when selecting control panels to power ventilators using power closed / power open actuators. A damaged cable that is unmonitored cannot be brought to the attention of the building RACA Journal I January 2019 73