Product Technical Guides : US-EN Firestop Systems Guide For Specifiers | Page 84

Base material Type of joint — description Fire rating (F rating) Max. joint width (inches) Movement capability Hilti product used System number Sealant depth (inches) See page > Floor to floor, wall to floor and wall to wall joints (continued) Gypsum wall to concrete floor (bottom of wall) 1 or 2 hr 3/4" - CP 601S, CP 606, FS-ONE, CFS-S SIL GG, CP 605 BW-S-0002 5/8" 573 G Gypsum shaft wall to concrete floor (bottom of wall) 1 or 2 hr 1" - CP 606, CP 605 BW-S-0023 * 574 G Gypsum wall to concrete floor (bottom of wall) 1 or 2 hr 3/4" - CFS-TTS BW-S-0039 - 575 G Gypsum wall to non-rated roof deck (top-of-wall continuity joint) 2 hr 1-1/2" 50% CFS-SP WB CJ-D-0004 1/8" 576 G Gypsum wall to column 1 or 2 hr 1-1/2" - CFS-SP WB HI/JF 120-01 1/8" 577 G Gypsum wall perpendicular to concrete over metal deck with optional use of spray-on fireproofing (includes roof deck) (top-of-wall) 1 or 2 hr 1" 50% CFS-SP WB HW-D-0042 1/8" 579 G Gypsum wall perpendicular to concrete over metal deck (includes roof deck) (top-of-wall) 1 or 2 hr 3/4" 33% CP 606 HW-D-0045 1/2" 581 G Gypsum wall parallel to concrete over metal deck with optional use of spray-on fireproofing (includes roof deck) (top-of-wall) 1 or 2 hr 1" 50% CFS-SP WB HW-D-0049 1/8" 582 G Gypsum wall to concrete over fluted metal deck (top- of-wall) 1 or 2 hr 3/4" 17% CP 606 HW-D-0077 5/8" or 1-1/4" 584 G Gypsum wall to concrete floor or hollowcore (top- of-wall) 1 or 2 hr 3/4" 17.00% CP 606 HW-D-0083 5/8" or 1-1/4" 585 G Gypsum wall parallel to concrete over metal deck with optional use of spray-on fireproofing (includes roof deck) (top-of-wall) (sealant only) 1 or 2 hr 3/4" 17% CP 606 HW-D-0184 5/8" 586 G Gypsum wall to concrete floor or hollow core concrete (top-of-wall) 1 or 2 hr 3/4" 17% CP 606 HW-D-0209 5/8" 587 G Gypsum wall parallel to concrete over metal deck with spray-on fireproofing (top of wall) (beam/bar joist through joint) 1 or 2 hr 1" 25% CFS-SP WB HW-D-0218 1/8" 588 G Gypsum wall to underside of steel beam and concrete over metal deck with spray-on fireproofing (top-of-wall) 1 or 2 hr 1" 50% CFS-SP WB HW-D-0259 1/8" 590 G Gypsum wall parallel to concrete over metal deck (wall not centered under lower plane of flute) (top of wall) 1 or 2 hr 1" 18.75% CFS-SP WB HW-D-0264 1/8" 592 G Gypsum shaft wall to concrete floor (top of wall) 2 hr 3/4" 8% CP 606 HW-D-0342 1" 594 G Top of gypsum wall assembly to concrete over metal deck floor/roof assembly 1 or 2 hr 1" 12.50% CFS-SP WB HW-D-0388 1/8" 595 G Gypsum Wall to concrete over metal deck (offset to flute) 1 or 2 hr 3/4" 17.00% CFS-SP WB, CP 606 HW-D-0396 1/8" 597 G Gypsum wall to concrete over metal deck (top-of- wall) (perpendicular) 1 hr 2" 20.00% CFS-SP WB HW-D-0564 1/8" 599 G Gypsum wall to underside of fireproofer steel I beam 1 or 2 hr 1/2” 50% CFS-SP WB HW-D-0634 1/8” 601 G Gypsum Shaft Wall to concrete over metal deck (perpendicular/parallel) or concrete floor/hollow core 1 or 2 hr 1-1/2" 25% CFS-SP WB HW-D-0750 1/8" 603 G Gypsum wall to concrete over concrete floor (top-of- wall) (perpendicular) 1 or 2 hr 3/4" 50% CFS-TTS HW-D-0757 * 606 G Gypsum wall perpendicular to fluted metal deck 1 or 2 hr 2-1/2" 40% CFS-SP WB HW-D-1066 1/8" 607 G Hilti Firestop Saving lives through innovation and education 82 * Refer to UL System. C Concrete or concrete block G Gypsum W Wood