Parks and Recreation System Master Plan Update (2016) parks_and_recreation_system_master_plan_update_oct | Page 173

Recreational Facilities The 1995 Plan projected costs that totaled $32.3 million for specific recreational facilities, ranging from playgrounds and playing fields to a 412 million multi-sports complex. A cost estimate breakdown was presented in Appendix B. In prioritizing recreational facility development, those facilities typically found throughout the park system (including playgrounds, basketball, tennis, softball and baseball, volleyball, and soccer) were given the same relative importance, with 60 percent of the total cost assigned a top priority rating, and the remaining 40 percent split evenly between second and third priority rating. (See Table VII.A.2.) Given the lower importance attached to new swimming pools, in addition to their high operating cost, a new pool was shown as a third priority in Table VII.A.2. Four new recreation centers were included as top priority, with fifth and sixth centers included as second and third priorities. The proposed new $12 million multi-sports complex was shown as a cost split between the second and third priority ratings. This reflected the possibility that the complex could be built as a phased development. Table VII.A.2 Recreation Facility Capital Costs Estimate (in 1995 dollars) Item Top Priority Second Third Priority Priority Playgrounds 1,440,000 480,000 480,000 Basketball 360,000 120,000 120,000 Tennis Courts 378,000 126,000 126,000 Softball/Baseball 990,000 330,000 330,000 Volleyball 72,000 24,000 24,000 Soccer 852,000 284,000 284,000 Swimming Pool 0 0 1,500,000 Recreation 8,000,000 2,000,000 2,000,000 Centers Multi-Sports 0 6,000,000 6,000,000 Complex Total 12,092,000 9,364,000 10,864,000 Total 2,400,000 600,000 630,000 1,650,000 120,000 1,420,000 1,500,000 12,000,000 12,000,000 32,320,000 Source: Wallace Roberts & Todd Greenways An estimated total of $40 million was included for development of the proposed network of greenways. This was not an estimate of the entire greenway system implementation cost, but only an allowance for LMPRD’s share of the total. The greenways concept was being pursued by MSD in 1995 as part of its stormwater management program, and it was expected that MSD would play a significant role in implementation of the greenways system. The LMPRD’s share of costs was to be primarily related to recreational enhancements to the 152 VII. IMPLEMENTATION | October 2016 Update