MANAGEMENT OF NORM IN THE PETROLEUM INDUSTRY Akpojevwa Tega Naomi, october 2016 | Page 57

These are issued pursuant to the provisions of The Mineral Oils (Safety) Regulations (MOSR 1972) and all other related provisions of the DPR Procedure Guide for the Construction and Maintenance of Fixed Offshore Platforms/Oil & Gas Facilities. They shall apply to all petroleum handling facilities in the Nigerian Petroleum Industry and are applicable to all major phases in the life cycle of facilities development/ modification projects at the:  Conceptual and Front End Engineering Phase  Engineering Design Phase  Procurement & Construction Phase  Commissioning Phase  Operation Phase The Guidelines for Compliance with the Technical Safety Control (TSC) Requirements spell out the statutory procedures that must be followed by operators in achieving full compliance with the TSC requirements of their Facilities Development/Modification Projects. Decommissioning phase is however conspicuously absent in the Guidelines for Compliance with the TSC Requirements. Although, the Procedure Guide for the Design and Construction of Oil and Gas Surface Production Facilities (2006) requires that there shall be four (4) stages of approval for any project execution, namely:  Conceptual Design 46