EPark EPark Brochure | Page 5

DC1 Footprint 42,000 sq ft (3,900 sq m) DC2 Footprint 42,000 sq ft (3,900 sq m) DC3 Footprint 186,000 sq ft (17,286 sq m) Phase 2 6.4 acres (2.6 hectares) Phase 3 5.5 acres (2.2 hectares) 110 kV Substation Sustainability  Craydel Group own and operate 300 MW of Wind Power in Ireland and have a further 100 MW under construction. Upon commissioning, it is envisaged that EPark can be powered from 100% renewable sources.  All of the proposed data centres are to be constructed to the highest possible standards to ensure that they achieve a high LEED certification. This will be achieved by having a holistic approach to the lifecycle of the building from the procurement stage through design, construction and operation of the centre ensuring a sustainable and efficient development.  Climatic conditions support a range of free air cooling solutions to suit specific occupier requirements. Flexibility  The Developers are willing to consider a variety of options including: • Leasing or Selling • Joint Venture with Operator • Occupying in phases • Right of first refusal on additional space PAGE 5