DRAFT GreenPoint Rated Existing Home Rating Manual version 6.0 | Page 141

P Design Considerations conducting commissioning type of work. The professional does not have to be a third party commissioning agent to complete this work. The following work must be completed: ? ? ? Calibrate all sensors, thermostats, automatic dampers, and other devices that cause equipment to respond to these settings. Use established protocols and calibrated test equipment. Verify the system is balanced by assessing the distribution system for consistency and/or comfort. Using the SoO, test the components, equipment, systems, and integrated systems (in this order) to verify operations are working as expected. All tests are to be documented by writing out expected results, listing the procedure, initial settings, modifications or imposed configurations, and the anticipated response. Use this document to identify each step as successful or list assessment of areas that may need repair or replacement in a log. Include the following steps in each plan. – – – ? Verify startup occurs through automatic and manual means, including testing equipment after an unplanned shut-down. Verify equipment shut-down occurs automatically (if applicable) as outlined in the SoO, including emergency procedures. Verify that changes in state occur during the operation of the equipment, including staging, sequencing of various components, alarms, and other observable actions. Where the equipment response is contrary to the planned response, re-evaluate the sequence and determine if the equipment or plan is wrong. Based on the evaluation, either correct the plan and retest or determine the operational problem, make corrections, and retest. Remediation Plan, System Manual, and Operator Training (1 Point) P1.3. Note: Measures P1.1 and are prerequisites for this measure: Create a plan for remediation of deficient areas based on the assessment created in measure P1.2. Create a system manual that includes equipment warranties, operations manuals for all systems, findings made during testing, the Sequence of Operations, and the maintenance schedule. Information gathered for this manual should be combined with the information required for the O&M manual described in measure O3.2, “Provide O&M Manual and Orientation to Building Maintenance Staff (Required)”. Provide training for building operators on how to properly operate and maintain the particular systems in their building. All trainings must be delivered by the consultants, vendors, and/or contractors involved in the existing building commissioning. Training should be done at the end of the existing building commissioning process and shall include a review of the remediation plan, the systems manual, improvements made to the system, and the controls. VERIFICATION Measure P1.1: Documentation: The ap ???????????????????????????????????????????????? ?? ??M??????????=??????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????e??????????()9????M??????????????????????????????5?????? ????? ??????(????????????????????????????????????????????????????????????????????????????????????????????????????????A????I???????????!????I?????5?????Y??????????M??????????? ?? ????%????????((0