Performance optimisation is seldom
measurements, followed by continuous
box’ of the ClimaCheck, monitoring starts
by leading cooling and heating system
reported on or documented and
monitoring and analysis of the data.
without any input of manufacturer’s data.
manufacturers. Internationally, 20 training
responsibilities for checking performance
Currently ClimaCheck systems are in
All ClimaCheck reports are unbiased
centres have had the performance
are often unclear. Service contractors are
operation and the data is analysed online.”
of any manufacturer’s data, and are
of their training plant validated by
used internationally in a wide range of
ClimaCheck. The performance of the
genera lly hired to maintain temperatures
Typically it takes 30 minutes to connect
and not to optimise performance. It is
the sensors of the ClimaCheck to a system:
applications, for example, troubleshooting
HVAC&R systems installed by contestants
acknowledged that cooling has a cost,
two pressure sensors, seven temperature
to minimise energy consumption
in the Swedish skills competition was
but how much should that cost be?
sensors and one sensor to measure the
costs, preventative maintenance to
validated by ClimaCheck. Manufacturers
power input. The sensors are basic and do
alert possible imminent breakdowns,
of new synthetic refrigerants have also
Who is accountable for efficiency?
not require the plant to be stopped. Once
validation of plant performance after
used ClimaCheck to validate cooling
The design engineer is required to meet
the sensors are connected to the ‘black
commissioning and quality assurance
performance at different conditions.
the specification and the contractor
to attain the required temperature.
The plant owner is only familiar with
temperature and needs to pay the
bills. No party is given the responsibility
for validating plant performance. The
fundamental issue in the HVAC&R industry
is that system efficiency is no‑‑one’s
responsibility; but not only that, until now it
was nearly impossible to measure.
It is acknowledged
that cooling has a cost,
but how much should
that cost be?
The actual performance of a plant
differs from the technical specifications
of the different components, and is
influenced by many variable operating
parameters. “The ClimaCheck can be
considered as the electrocardiogram
(ECG) of HVAC&R installations,” says
Berglöf. “The process starts with field
know
what’s
happening
when it’s
happening
INCORPORATING COLD CHAIN
e-newsletter
go to
www.coldlinkafrica.co.za
to subscribe
32
www.coldlinkafrica.co.za
COLD LINK AFRICA • July | August 2016