Assessment questionnaires Final Assessment Questionnaire - 2017 | Page 3
ALL ROADS LEAD TO ROME - KA2
Excellent
coordination must improve.
There has been a lot of good collaborative work done among
students with a good coordination.
1.1.5. Number of products made by using ITC
Poor
Students have produced very few products (1 or 2) using ITC at each
school.
Must improve
Students have made 3-4 products using ITC at every school but
none together with their partners.
Good
Students have made a minimum of 5 products using ITC at their
school but 1-2 at international level.
Excellent
Students have made a minimum of 5 products using ITC at their
school and a minimum of 4 at international level.
1.1.6. Number of extracurricular activities done based on the project
Poor
Extracurricular activities haven't been done.
Must improve
A minimum of 2 extracurricular activities have been done at the
participant schools.
Good
3 or 4 extracurricular activities have been done at all the schools
participating in the project.
Excellent
5 or extracurricular activities have been done at each school
participating in the project.
1.1.7. Number of subjects involved in the project at each school
Poor
Only 1 or 2 subjects have been involved.
Must improve
About 30 % of subjects have been involved but participation hasn't
been even.
Good
More than 50% of subjects have been involved in some of the
activities of the project but coordination must improve.
Excellent
From 70% to 100% of subjects have been involved in the project with
a good coordination and results.
1.1.8. Number of people involved from the educational community at each
school
Poor
Only teachers and families of students travelling.
Must improve
About 30% of teachers and students and the families of the students
travelling.
Good
More than 50% of teachers, students and families have been
involved. There has been some participation from the Town Hall.
Excellent
From 70% to 100% teachers, students and families have been
involved. Town Hall, teacher’s centre and educational authorities
have been also involved as well as the university.
1.1.9. Project results achieved during year 2 of the project
Poor
Not all the outcomes have been achieved.
Must improve
Most outcomes have been achieved.
Good
All the outcomes have been achieved and some not previously
2
Project No. 2015-1-ES01-KA219-015682