104
buildings , industrial facilities and technological equipment and their condition
in Bulgaria
80
1.1 . Standards
80
1.2 . Laws , regulations , ordinances , bylaws
81
2 . European regulatory framework
81
3 . National regulatory framework . Basic normative documents
82
4 . Assessment of the condition of construction regulations in Bulgaria
83
3.10.2.6 . TRACING AND CONTROL DURING CONSTRUCTION AND
ASSEMBLY OF BUILDINGS
84
1 . Initial projects and geodetic basis for compiling the tracing projects and their
application
84
2 . Projects for tracing the axes of buildings
87
3 . Orthogonal way of tracing the principal and detailed axes of buildings
87
4 . Other methods for tracing the principal axes of buildings
90
5 . Starting benchmark in the construction of buildings
90
6 . Composing protocols for submission of the traced objects
90
7 . Cord scaffolding and tracing of detailed axes
92
8 . Tracing and control in constructing the underground part of buildings
93
8.1 . Tracing , control and acceptance of excavation works and shaping the excavation
Bottom
94
8.1.1 . Tracing and control in excavation and embankment works
94
8.1.2 . Instructions , requirements and control in excavation and embankment execution
96
8.1.3 . Shaping the excavation bottom and its acceptance
98
8.2 . Tracing and control in formwork activities
99
8.3 . Tracing and control in reinforcement and concrete works
100
8.4 . Permissible deviations in the construction of the underground part of buildings
101
8.5 . Tracing and control in the construction of the floor structure of the building ,
elevation ± 0
103
9 . Tracing and control in the construction of the above-ground part of buildings
9.1 . General statements
104
9.2 . Course of tracing and control in the construction of monolithic buildings after
elevation ± 0
105
9.3 . Performance of tracing and control
106
9.3.1 . Transfer of exported axes , survey , acts and sketches , tracing
106
9.3.2 . Geodetic survey and tracing with automated ( robotized ) total stations
107
9.3.3 . Available possibilities
108
9.3.4 . Using the possibilities in geodetic survey
108
9.3.5 . Using the possibilities in tracing
108
9.3.6 . Conventional tracing and control of columns and slabs
109
9.4 . Tracing and verifying formwork elevations on the individual floors
110
9.5 . Preparatory works , tracing and control in the construction of skeleton-panel
buildings above elevation ± 0
111
9.5.1 . Preparatory works
112
9.5.2 . Assembly of columns and verifying their verticality
114
9.5.3 . Tracing and control in the assembly of trusses
118
9.5.4 . Tracing , assembly and control of bridge and other cranes
119
92