CONTENTS of Book 3 ( 3.3 )
3.10 . DESIGN , TRACING AND CONTROL IN THE CONSTRUCTION AND INSTALLATION OF BUILDINGS , INDUSTRIAL FACILITIES AND TECHNOLOGICAL EQUIPMENT 18
3.10.1 . General information about the construction of buildings , industrial facilities
and technological equipment
18
3.10.2 . Types of buildings , design , construction , installation and operation of
buildings
18
3.10.2.1 . General statements
18
1 . General on buildings and exposition
18
2 . Basic requirements for the structures
20
3 . Structural systems and schemes of buildings
21
3.10.2.2 . Classification of buildings
22
1 . General on the classification of buildings , facilities and documents
22
2 . Current classification of buildings
22
2.1 . Main subdivision
22
2.2 . Detailed subdivision
23
2.2.1 . Dependence on the functions
23
2.2.2 . Subdivision according to the type of structures
25
2.2.3 . Types of construction
26
2.2.4 . Dependence on other building parameters
27
3.10.2.3 . Building design
27
1 . General on design . Contents of a building project
27
1.1 . General statements
27
• Types of projects
28
• Project content
28
1.3.1 . Architectural part
28
1.3.2 . Structural part
31
1.3.2.1 . Choice of structure type
32
1.3.2.2 . Static calculation
32
1.3.2.3 . Dimensioning of elements
32
1.3.2.4 . Construction and drawing of elements
32
1.3.3 . Parts related to building installations
34
1.3.3.1 . Part water supply and sewerage
34
1.3.3.2 . Part electric
34
1.3.3.3 . Part heating and ventilation
34
1.3.3.4 . Part energy efficiency
34
1.3.3.5 . Part gas installations
34
1.3.3.6 . Parts of the project on organization and cost of construction
35
1.3.4 . Part environmental impact assessment
35
1.3.5 . Technological part
35
1.3.6 . Geodetic part of the project and prerequisites for its development and
application
35
3.10.2.4 . Construction and control of buildings
37
1 . Preparatory works at the construction site
37
2 . Start of construction
37
3 . Providing a construction line and level
39
4 . Construction of the underground part of the building
40
90