2019-2020 Year End Results | Seite 42

WVUSD: 2019/2020 Year-End Results • Diamond Bar High School Non-Bond Projects o Completed painting of interior of Performing Arts Theatre and gymnasium o Repaired concrete on stairs throughout campus o Slurry seal/stripe parking lots and access road summer 2020 o Installed rubber flooring in weight room o Replace existing turf at football field scheduled for summer 2020 o Repair and restripe existing running track scheduled for summer 2020 o Replaced existing ceiling tiles in band practice rooms o Installed new gymnasium doors o Installed new, temporary food services building at interim housing Bond Projects o Completed installation of security cameras o Started construction for new music building o Started construction for 500 building modernization – science building o Completed installation of 44 modular buildings and 6 restroom buildings o In design for 400 building modernization • Ron Hockwalt Academies Non-Bond Projects o Modified rooms 9 and 10 to accommodate relocation of Adult Transition Program from Mt. SAC o Slurry seal/stripe parking lots summer 2020 o Installed concrete walkway between existing portables – numbers 18 and 19 o Converted existing classroom into science classroom – room 11 o Converted existing classroom into administration office – room 18 Bond Projects o Completed installation of security cameras 41