2019-2020 Year End Results | Page 41

WVUSD: 2019/2020 Year-End Results • South Pointe Middle School Non-Bond Projects o Completed solar installation o Completed painting of interior of gymnasium o Completed HVAC replacement at MPR and gymnasium (under Prop 39) o Completed resurfacing of gymnasium floor o Slurry seal/stripe parking lots and playgrounds summer 2020 o Resurface tennis courts summer 2020 o Mounted and installed power for 42 new TV monitors in classrooms o Installed new baseball field and backstop o Installed new epoxy floor in kitchen Bond Projects o Completed installation of security cameras o Completed classroom electrical upgrades o Completed installation of new flooring in classrooms, locker rooms, and kitchen speed line area o In design for new music building – submit to DSA June 2020 • Suzanne Middle School Non-Bond Projects o Slurry seal/stripe parking lots and resurface playgrounds summer 2020 o Painted and installed carpet in existing tech lab o Cracked filled and restriped existing basketball courts o Installed new PA and sound systems in 7 th -8 th grade locker rooms o Installed new PA system in 6 th grade locker room Bond Projects o Completed installation of security cameras o In design for new gymnasium – submit to DSA June 2020 o In design for new two-story science building – submit to DSA June 2020 o In design for new music building – submit to DSA June 2020 40