WVUSD: 2019/2020 Year-End Results
• Collegewood Elementary School
Non-Bond Projects
o Completed installation of new sound system in MPR
o Slurry seal/stripe parking lots and playgrounds summer 2020
o Relocated existing backstop and benches at upper playfield
o Painted interior classrooms – rooms D1, D6, B3 and B4
Bond Projects
o Completed installation of security cameras
o Started construction for new two-story classroom
o Relocated existing playground to upper playfield
• Cyrus J. Morris Elementary School
Non-Bond Projects
o Slurry seal/stripe parking lots and playgrounds summer 2020
o Repaired existing concrete and asphalt throughout campus for tripping hazards
o Installed new drainage at bottom of existing ramp at lower playground for standing water
o Installed new chain link fencing behind existing portables for safety
o Enlarged existing sensory room
o Repaired existing ceiling tiles in MPR
o In process of installing window blinds in all classrooms
Bond Projects
o Completed installation of security cameras
• Evergreen Elementary School
Non-Bond Projects
o Completed installation of new sound system in MPR
o Slurry seal/stripe parking lots and playgrounds summer 2020
o Removed and replaced concrete in front of room 6
o Replaced ramp at Fun Club
Bond Projects
o Completed installation of security cameras
o DSA approved new parent drop off parking lot, upper playfield
37