x CCP_REVIT Full Combined CCPs | Page 10

Site and Project Setup Go to the ‘Insert’ tab and select ‘Link Cad’ from the tool ribbon. The reason we want to link the Cad and not import is that Linked drawings inside of Revit are a lot easier to manage, update turn on/off etc. Browse to the folder where you store the DWG survey file you flattened and select it. Uncheck the option Current View Only, you may Preserve the colours, set the import units to Meters (or the units that your DWG was drawn in, Auto Detect does not always work and you might have to re-scale the DWG inside Revit), the Positioning can be Auto Centre-Centre, uncheck ‘Correct lines that are slightly off axis’, Place at Level 1 and Orient to view. Click Open Once the DWG has been linked you may check the scale of it to make sure. Tel : 086 166 3362 Fax : 086 567 2315 e-mail : [email protected] Physical Address : 5 Pont Road, Bryanston, Johannesburg Page 10 of 33