Pavement preservation |
• Digitize annual Street Services work plans to allow for better coordination with the Department of Transportation .
• Inspect and repair 100 crosswalks on the High-Injury Network .
|
• Inspect and repair 200 crosswalks on the High-Injury Network . |
BSS , LADOT |
Speed surveys |
• Complete 100 % of the expired surveys along the priority corridors , 75 % of the High-Injury Network and 50 % Citywide . |
• Complete 100 % of the expired surveys Citywide . |
• Continue to keep all surveys active ; evaluate need for new surveys . |
LADOT , LAPD |
Temporary street closures |
• Provide annual Department of Water and Power work plan to allow for better coordination with other City departments ; evaluate temporary sidewalk closure procedures . |
• Update the Work Area Traffic Control Handbook ( WATCH ) to strengthen requirements for pedestrian and bicycle detours ; update training modules to incorporate changes . |
• Work to update state traffic control device standards to include more innovative safety treatments . |
LADWP , LADOT |
Bicycle network |
• Identify bike network gaps during initial project development . |
• Develop a system for pavement inspection / repair of bikeway facilities . |
• Repair all bikeway facilities on the High- Injury Network . |
LADOT , BSS |
Traffic signs |
• Maintain and upgrade speed limit signage . |
• Upgrade the existing sign maintenance program . |
• Create geocoded database of all department assests . |
LADOT |
Safe Routes to School ( SRTS ) |
• Install 180 high-visibility crosswalks near 50 schools on the High-Injury Network . |
• Complete 50 Safe Routes to School safety plans . |
• Implement 50 Safe Routes to School safety plans . |
LADOT |
Speed mitigation around schools |
• Install 11 school safety zones ( 15 miles per hour zone within 500 feet of school ). |
• Install 50 school safety zones . |
• Install 100 school safety zones . |
LADOT , LAPD |
Capital safety improvements |
• Build 25 concrete pedestrian islands . |
• Prioritize 50 location candidates for capital projects . |
• Prioritize 100 location candidates for capital projects . |
BOE , LADOT |
Street lighting |
• Identify areas for lighting improvements ( i . e ., bus stops , mid-block crossings , and underpasses ). |
• Make lighting improvements on 50 percent of the High-Injury Network . |
• Complete all lighting improvements on the High-Injury Network . |
BSL , LADOT |
Street design |
• Complete 12 miles of street design plans . |
• Complete 48 miles of street design plans . |
• Complete 120 miles of street design plans . |
LADOT |
City design standards |
• Update City design standards using Vision Zero principles . |
• Update curb ramp standards . |
• Identify and complete updates to additional design standards . |
LADOT , BOE |
Signal timing |
• Optimize 400 traffic signals for all road users ; pilot signal timing strategy . |
• Optimize 1,600 traffic signals for all road users . |
• Optimize all traffic signals for all road users .
LADOT