Pavement preservation |
• Digitize annual Street Services work plans to allow for better coordination with the Department of Transportation.
• Inspect and repair 100 crosswalks on the High-Injury Network.
|
• Inspect and repair 200 crosswalks on the High-Injury Network. |
BSS, LADOT |
Speed surveys |
• Complete 100 % of the expired surveys along the priority corridors, 75 % of the High-Injury Network and 50 % Citywide. |
• Complete 100 % of the expired surveys Citywide. |
• Continue to keep all surveys active; evaluate need for new surveys. |
LADOT, LAPD |
Temporary street closures |
• Provide annual Department of Water and Power work plan to allow for better coordination with other City departments; evaluate temporary sidewalk closure procedures. |
• Update the Work Area Traffic Control Handbook( WATCH) to strengthen requirements for pedestrian and bicycle detours; update training modules to incorporate changes. |
• Work to update state traffic control device standards to include more innovative safety treatments. |
LADWP, LADOT |
Bicycle network |
• Identify bike network gaps during initial project development. |
• Develop a system for pavement inspection / repair of bikeway facilities. |
• Repair all bikeway facilities on the High- Injury Network. |
LADOT, BSS |
Traffic signs |
• Maintain and upgrade speed limit signage. |
• Upgrade the existing sign maintenance program. |
• Create geocoded database of all department assests. |
LADOT |
Safe Routes to School( SRTS) |
• Install 180 high-visibility crosswalks near 50 schools on the High-Injury Network. |
• Complete 50 Safe Routes to School safety plans. |
• Implement 50 Safe Routes to School safety plans. |
LADOT |
Speed mitigation around schools |
• Install 11 school safety zones( 15 miles per hour zone within 500 feet of school). |
• Install 50 school safety zones. |
• Install 100 school safety zones. |
LADOT, LAPD |
Capital safety improvements |
• Build 25 concrete pedestrian islands. |
• Prioritize 50 location candidates for capital projects. |
• Prioritize 100 location candidates for capital projects. |
BOE, LADOT |
Street lighting |
• Identify areas for lighting improvements( i. e., bus stops, mid-block crossings, and underpasses). |
• Make lighting improvements on 50 percent of the High-Injury Network. |
• Complete all lighting improvements on the High-Injury Network. |
BSL, LADOT |
Street design |
• Complete 12 miles of street design plans. |
• Complete 48 miles of street design plans. |
• Complete 120 miles of street design plans. |
LADOT |
City design standards |
• Update City design standards using Vision Zero principles. |
• Update curb ramp standards. |
• Identify and complete updates to additional design standards. |
LADOT, BOE |
Signal timing |
• Optimize 400 traffic signals for all road users; pilot signal timing strategy. |
• Optimize 1,600 traffic signals for all road users. |
• Optimize all traffic signals for all road users.
LADOT
NOTE: Support agency in italics
|