TPDES Stormwater Annual Report FY2021 TPDES Stormwater Annual Report FY2021 | Page 8

Repair Drainage Structure
1904.25
53
Request Line Locate
10.5
9
Saw Cutting
23.5
1
Seal Joint
0
5
Storm Inspection
229.84
558
Trim Trees / Brush
57.5
4
Grand Total
15,614.215
16,206
II .
Floatables a . Source Controls and Monitoring - Sweeping
The Stormwater Maintenance Crew performs maintenance activities that reduce the volume of sediment and floatable materials that have the potential to reach the MS4 and receiving waters . The Stormwater Management Division also contracts street sweeping activities for the removal of sediment and floatables from the MS4 . The following tables summarize their contribution to the removal of sediment and floatables .
In-house Street Sweeping :
Activity
Labor Hours
Curb Miles Swept
Debris Removed
( Cubic Yards )
Street Sweeping ( in-house )
798
878.67
267
In-house Airport Sweeping :
In 2019 , the City of Arlington Municipal Airport purchased a “ FOD * BOSS Sweeping Mat ” to replace contracted sweeping activities . The contractor ’ s service was unable to remove the smaller items ( FOD – Foreign Object Debris ) that could damage aircraft . Additionally , the FOD * BOSS is designed solely for collecting FOD from tarmac and aircraft movement surfaces . Sweeping frequency is 1 time per week , utilizing two ( 2 ) to three ( 3 ) man hours each run . Sweeping for the reporting period is outlined below :
Month
Recorded Mileage
October
56.4
November
29.3
December
34.3
January
35.3
February
29.1
March
63.6
April
43.5
May
65.8
June
91.6
July
73.6
August
45
September
76.3
Grand Total
643.8