Repair Drainage Pipe |
67.5 |
0 |
Repair Drainage Structure |
1686.5 |
30 |
Repair Sidewalk |
1 |
0 |
Request Line Locate |
10.75 |
0 |
Sandbag Operation |
7.5 |
0 |
Saw Cutting |
13 |
0 |
Severe Weather Response |
46 |
0.75 |
Special Events |
8 |
0 |
Special Projects |
119.5 |
0 |
Storm Inspection |
339.39 |
12.1 |
Trim Trees / Brush |
14.25 |
0.25 |
Grand Total 15,884.2 1,408.43
II .
Floatables a . Source Controls and Monitoring - Sweeping
The Stormwater Maintenance Crew performs maintenance activities that reduce the volume of sediment and floatable materials that have the potential to reach the MS4 and receiving waters . The Stormwater Management Division also contracts street sweeping activities for the removal of sediment and floatables from the MS4 . The following tables summarize their contribution to the removal of sediment and floatables .
In-house Street Sweeping :
Activity |
Labor Hours |
Curb Miles Swept |
Debris Removed |
|
|
|
( Cubic Yards ) |
Street Sweeping ( in-house ) |
784.5 |
1081.96 |
971.6 |
In-house Airport Sweeping :
In 2019 , the City of Arlington Municipal Airport purchased a “ FOD * BOSS Sweeping Mat ” to replace contracted sweeping activities . The contractor ’ s service was unable to remove the smaller items ( FOD – Foreign Object Debris ) that could damage aircraft . Additionally , the FOD * BOSS is designed solely for collecting FOD from tarmac and aircraft movement surfaces . Sweeping frequency is 1 time per week , utilizing two ( 2 ) to three ( 3 ) man hours each run .
Month
Recorded Mileage |
October |
103.9 |
November |
41.2 |
December |
105.8 |
January |
0 |
February |
53.7 |
March |
33.1 |
April |
27.5 |
May |
62.5 |
June |
47.9 |
July |
41.4 |
August |
0 |
September |
24.5 |
Grand Total |
541.5 |
12