Backfill |
307 |
0 |
Bridge Deficiency Repair |
39.25 |
0.2 |
Clean Concrete Channel |
2549.5 |
303.165 |
Clean Culvert / Bridge |
2048 |
347.6 |
Clean Earthen Channel |
360 |
33.25 |
Clean Flume |
1316.45 |
130.45 |
Clean Inlet |
564.46 |
56.2 |
Clean / Grade Bar Ditch |
241 |
3.75 |
Collect Data |
1.5 |
0 |
Contract Inspection |
121 |
0 |
Control Vegetation |
346.89 |
31.7 |
Dirt & Mud Removal |
228.25 |
160.065 |
Field Inspection ( No Condition ) |
743.82 |
4 |
Graffiti Clean Up |
93.31 |
0 |
Hydro Excavation |
25.5 |
4 |
Illegal Dumping Response |
34 |
2.75 |
Inlet Decal Install |
65.44 |
0 |
Inlet Inspection |
1369.56 |
100 |
Inspect |
0.25 |
0 |
Inspect Channel / Flume |
655.5 |
0.25 |
Inspect Culvert |
1.25 |
0 |
Lid Replacement |
17.13 |
0 |
Locate Line |
45.75 |
0 |
Mapping / Data Request |
34.5 |
0 |
New Installation |
46.5 |
0 |
On-Call |
0.75 |
0 |
Other Departments |
3 |
0 |
Paint |
15 |
0 |
Pipe Inspection - Emergency Callout |
60 |
0 |
Pipe Inspection - Grid Work |
423.5 |
0 |
Pipe Inspection - Maintenance Issue |
133 |
0 |
Pipe Inspection - Postconstruction |
27.75 |
0 |
Pipe Inspection - Preconstruction |
11 |
0 |
Remove |
3 |
0 |
Remove Beaver Dam |
10.5 |
0 |
Remove Debris |
739.25 |
148.7 |
Remove Tree Limbs |
888.25 |
39.25 |