2019 Stormwater Maintenance – Maintenance of existing drainage systems at 1205 and 1207 Brittany Lane , 100 & 101 N . Collins Street , 1901 Thames Drive , and 2314 and 2316 Perryland Drive . This project will be constructed in phases . Bonneville / Greenbrook Drainage Improvements – Study to evaluate drainage improvements to alleviate residential and street flooding . California Lane Conceptual Study – Evaluation of existing drainage systems to determine options to mitigate street and residential flooding within various Sub-basins of the Rush Creek Watershed bordered by Arkansas Lane to the north , Mayfield Road to the south , between Bowen Road to the west , and Fielder Road to the east . Cottonwood Creek 2 Channel Improvements - Drainage improvements to repair a deteriorating concrete channel and mitigate residential flooding . Harvest Hills and Briar Meadow Drainage Improvements – Drainage improvements to alleviate residential and street flooding . Design and construction will be completed in phases . Phase 1 includes channel improvements , which are under design . Kee Branch Trib 1 ( Green Oaks to Oak Springs ) Erosion – Reach based streambank stabilization to reduce erosion and restore aquatic habitat as part of the Erosion Pilot Program . Kee Branch Trib 4 ( Deaver Park to Andalusia Trail ) Erosion – Reach based streambank stabilization to reduce erosion and restore aquatic habitat as part of the Erosion Pilot Program . Lower Johnson Creek Dredging – dredging of sediment from the Richard Green Linear Park pond within the Johnson Creek watershed
� North Fork Cottonwood Creek Channel Repair ( South of Park Row ) Phase 2 – channel improvements to repair erosion and undermining that occurred during the May / June 2015 storm events that is threatening adjacent buildings and overall channel improvements to repair a channel that is deteriorating . This project is on hold due to easement acquisition . � Matthews Court Drainage Improvements – Drainage improvements to alleviate residential flooding . � Rush Creek at Indian Trail Erosion - Channel improvements in Rush Creek to protect Indian Trail . �
�
VC ( A ) -1 : Ridgewood Terrace to Sylvan Drainage and Erosion Project – Drainage improvement project to addressed flooding and erosion . between Ridgewood Terrace and Sylvan Drive along Stream VC ( A ) -1 . Washington Creek Erosion – Reach based streambank stabilization to reduce erosion and restore aquatic habitat as part of the Erosion Pilot Program .
The following watershed studies were underway during the reporting period :
�
�
�
Rush Creek Watershed – This study is substantially complete . The mapping modifications are currently under FEMA review . Trinity River Tributaries and Lower Village Creek Watershed Study – Three consultants are under contract for individual creek segments . This study is substantially complete . The mapping modifications are currently under FEMA review . Lynn / Bowman , Upper Village , Trinity Tribs Watershed Study – Three consultants are under contract for individual creek segments . These studies include geomorphology . A Geomorphological Assessment for Fish and Cottonwood Creeks is also included in this project .
17 | Page