Design or As Built?
Design certification is awarded at
the end of the design phase of a
project so that a building can be
marketed as Green Star SA certified.
When construction is complete, the
project may be submitted for As
Built certification, which verifies the
procurement and implementation of
green building strategies.
“All stormwater from the
site are diverted back into
the Century City canal
system as per the Century
City: Sustainable Urban
Drainage System Evaluation
& Master Plan.”
Braam Basson – Aurecon
The Sable Park project will reach
practical completion in April. nn
Sable Park, showing cantilevers.
Project professionals
Client: Rabie Property Group
Project: Sable Park offices
Configuration: Four-storey, double basement
Plot size: 1 023ha
Built area: 16 300m 2
Main contractor: WBHO
Architect: dhk
Quantity surveyor: RLB Pentab
Civil and structural engineer/contractor: Aurecon
Electrical engineer: QDP
Mechanical engineer: BVI
Fire consultant: Solution Station
Landscape architect: Planning Partners
Environment: Ecosense
Green Star certification consultant: PJ Carew Consulting
Bulk excavation: 34 000m³
Start date: 25 November 2016
Earthworks end date: 15 March 2017
Occupation date: May 2018
Value: R460-million
CEC April 2018 - 19