SUP&R ITN outreach magazine SUP&R ITN Info document | Page 4

www.superitn.eu SUSTAINABLE RAILWAY’S TECHNOLOGIES (WP2) ESR No. Project Title Optimization of trackbed design and maintenance Characterisation of rubberised asphalt for ESR 8 railways sub-ballasts Modelling and Design of rubberised asphalt ESR 9 for railways sub-ballast Settlement monitoring and prediction in ESR 10 railway tracks Optimisation techniques for geophysical ESR 11 assessment of rail support structures ESR 7 ESR 12 The use of waste materials in railways Host Institutions Work Duration Package (month) Indicative start date UNOTT, IRAIL, SACYR WP2 36 month 6 UNIPA, UNOTT, UGR WP2 36 month 6 UNIPA, UNOTT, WP2 36 month 6 UCD, IRAIL, UPM WP2 36 month 6 UCD, ZAG WP2 36 month 6 UGR, SACYR, UNOTT WP2 36 month 6 WP3 Sustainability Assessment  Definition of sustainability metrics which are not present in LCA but that are fundamental for the sustainability assessment of transport infrastructures.  Data collection and development of a methodology for a broad sustainability assessment of Transport Infrastructures  Creation of transferable software allowing industry to assess where it currently stands in key sustainability indicators and determine how much it can improve using low-energy and more recycled materials. Such sustainability assessment tools will allow industry, road and railway agencies to recognize the impacts of different construction techniques, materials and methods, as well as the potential cost and resource savings enabling the deployment of more sustainable technologies. 3 Post docs will develop the Sustainability Assessment of the studied technologies by also producing ready-to-use transferable tools for assisting a future sustainable implementation of the infrastructure technology. SUSTAINABILITY ASSESSMENT METHODOLOGY (WP3) ER No. ER 1 ER 2 ER 3 Project Title Definition of sustainability assessment factors and current state-of-the-art in sustainable practices Sustainability assessment of the SUP&R ITN technologies SUP&R ITN assessment tool Host Institutions Work Duration Package (month) Indicative start date UNOTT, IFSTTAR, GR, CEEQUAL WP3 24 month 3 UNIPA, UNOTT, IFSTTAR WP3 18 month 18 IFSTTAR, UNOTT, URS WP3 24 month 24 4