SSIP Annual Reports 2018 Annual Report | Page 27

SSIP Annual Report 2018 27 Central Bayside System Improvement Project (CBSIP) This project contains critical collection system assets that serve neighborhoods spanning from the Marina to Bayview. Currently, 64% of the Bayside stormwater runoff and wastewater from homes and businesses is transported to the SEP via a pressurized pipe, called the Channel Force Main. This force main must always be working for the Bayside System to operate without disruption of service to the community. The 2.3-mile long force main was built in 1976 and is a single pipe, that runs through bay mud and fill with no backup (redundancy), in case of failure or maintenance needs. Another concern is that the force main was not built to current seismic standards and has suffered several failures since the 1989 Loma Prieta earthquake. The CBSIP team completed 35% Design in 2018 for a proposed tunnel project to provide reliable gravity conveyance (instead of the pressurized pipe). The proposed tunnel would also provide operational flexibility by increasing system storage. Currently, the project is only funded for planning, and preliminary design. The Commission will consider if the project will move forward into design and construction in 2019.