Service Center Solahart (081313462267) water heater | Page 27

33-1197 Solahart Owner‟s Manual – Thermosiphon Systems - Revision H – Nov 2013 25 FIBRO CEMENT OR METAL SHEET ROOFING Select a location for the storage tank close to a purlin. Avoid locating tank at mid-span of sheeting. Fixing and assembly procedures are similar to that detailed for tiled roofs, with the exception that the tank straps and the collector straps are fixed with coach screws to the purlins below (refer to drawings, Page 51). METAL TILED ROOF Select a location for the storage tank. The front mounting foot of the tank should be positioned directly over a tile batten. Fixing and assembly procedures are similar to that detailed for tiled roofs, except that the tank and collector straps are fixed with spring head galvanised nails directly through the metal tiles into the rafters below. Seal under the straps with a weatherproof mastic sealer. STANDS