Real Estate Investing Vol. 1 | Page 10

Second and Third Floor Guest Rooms The second and third floors are in the final stages of construction with most rooms needing finishing fixtures (bath and electrical). The majority of the rooms are drywall, textured and painted. A drop ceiling will need to be installed in the hallways. The airconditioning in the hallways is in place, along with the ductwork. Second Floor Southern Hallway Finished Without Fixtures (36 Rooms) 10