Hydraulic separation also allows building demand to vary without affecting the minimum flow requirements through the chiller evaporator. www. refrigerationandaircon. co. za 39
PROJECT
• several thousand litres of water disposal,
• lengthy refill procedures,
• chemical treatment,
• extensive air removal,
• recommissioning of every branch circuit.
The advantages included:
• dramatically reduced downtime
• elimination of system refill
• preservation of water treatment chemistry
• reduced risk of introducing contamination
• significantly shorter construction programme project
The resulting downtime would have been unacceptable.
Mezanine plantroom access: The mezanine plant area provided the ideal space for the replacement plant. Construction sequencing became an essential component of the overall engineering solution.
ENGINEERING DESIGN PHILOSOPHY Rather than replacing the complete installation in a single shutdown, RPM Consulting Engineers adopted a phased replacement strategy.
The philosophy was based upon four principles: 1. Maintain cooling throughout construction. 2. Replace equipment progressively. 3. Simplify future maintenance. 4. Improve overall system efficiency.
This resulted in a two-phase implementation programme.
PHASE 1 Phase 1 established the new chilled water infrastructure while retaining sufficient cooling capacity from the existing plant. Major works included:
• Installation of a new air-cooled screw chiller
• Construction of new chilled water headers
• Installation of new primary pumps
• Installation of secondary distribution pumps
• Installation of a thermal buffer tank
• New pipework and valves
• Electrical integration
• Control system integration
NITROGEN PIPE FREEZING One of the most technically interesting aspects of the project involved connecting the new pipework into the existing live chilled water system. Traditionally, such work requires complete draining of the building. Instead, nitrogen pipe freezing was utilised. Liquid nitrogen jackets were installed around the existing chilled water mains. The extremely low temperatures created temporary ice plugs within the pipe, effectively isolating the section requiring modification.
This allowed:
• cutting into live pipework
• installation of new tees
• valve installation
• welding
• pressure testing without draining the building.
RACA Journal I November 2026
This method proved highly successful and became one of the key enabling technologies for the project.
CHILLER SELECTION The replacement plant utilised a Midea SCAF285HV air-cooled variable-speed screw chiller with a nominal cooling capacity of approximately 1 003kW under design conditions. The selected unit uses R134a refrigerant, incorporates two variablefrequency Hanbell screw compressors, and is equipped with a microcomputer controller and VFD starter.
Key characteristics include:
• Variable-speed screw compressors
• High part-load efficiency
• Low starting current
• Electronic capacity control
• Integrated microprocessor control
• AHRI-certified performance
Variable-speed technology was selected because commercial office buildings spend the majority of their operating life at partial load. Rather than cycling compressors on and off, the inverter-driven compressors continuously modulate capacity to closely match the building load. This substantially improves seasonal efficiency.
The published performance data indicates: Operating condition
COP Full Load 3.42 75 % Load 4.68 50 % Load 5.07 25 % Load 6.08
These figures demonstrate the significant efficiency improvements available during typical operating conditions.
PRIMARY – SECONDARY PUMPING The replacement plant adopted a primary-secondary pumping arrangement. This configuration separates the chiller hydraulic circuit from the building distribution circuit.
Benefits include:
• stable evaporator flow,
• improved temperature control,
• independent pump control,
• easier future expansion,
• improved chiller protection,
• simplified maintenance.
Hydraulic separation also allows building demand to vary without affecting the minimum flow requirements through the chiller evaporator. www. refrigerationandaircon. co. za 39