High above a busy supermarket in Faerie Glen, Pretoria, the HVAC plantrooms feel more like an industrial museum than an air-conditioning space. Monolithic backward‐curved centrifugal fans, massive old air-handling coils bolted to steel frames, and a chiller plant room dating back to the late 1970s are all standing by for their final act.
This is the scene that Nigel Pengelly of VMG Consulting
Engineers walks us through on a site visit, tracing the story of the existing system and setting out what will soon take its place.
A MUSEUM PIECE THAT WAS ONCE STATE OF THE ART Pengelly estimates the current installation to be around 45 – 50 years old. In its day, it was a serious piece of engineering: large water‐cooled chillers, huge supply and return air fans, and a control philosophy that began as pneumatics before later being converted to electronic controls which also included an extremely early-trend central controller. Like many systems designed before powerful computer modelling was available, it was also generously over‐sized, just to be safe.
“ The original chillers ran on refrigerants such as R11 and R12 before being replaced in the early 2000s with ones using more acceptable ozone friendly R134a. Even with that mid‐life upgrade, the plant has long since crossed the line into being both obsolete and inefficient by modern standards,” he explains.
In terms of sheer scale, it’ s impressive. He puts the original plant capacity at over 2MW of cooling, serving not just the retailer but a much larger footprint than is required today.
RIGHT‐SIZING THE PLANT FOR TODAY’ S NEEDS The new design focuses on the store’ s much more modern and reduced trading area while the building focuses on an expanded number of shops and specialty stores to greatly enhance the offering to shoppers. That change alone allows for a dramatic reduction in plant size.
The old water-cooled chiller plant at the Faerie Glen store, now marked for complete removal as part of the HVAC upgrade.
In place of the sprawling legacy system, the new installation will feature:
• Two identical HC package units, installed back-to-back in a Siamese configuration, serving the store, located in the adjoining outside plant area.
• LG VRF outdoor units mounted on the existing steel superstructure, which used to support the chillers’ cooling towers.
• The complete removal of all the old air-conditioning