RACA Journal March 2020 | Page 52

Projects REFRIGERATION WORKS The mechanical team supplied a plant room that provides three Bitzer Multiplex racks that are charged with refrigerant gas R407F. The ethylene gas is also fitted in the plant room area. Two CaREcube side stream filtration units were installed and connected to the condensers. “These minimise dirt and algae build-up in the evap-condensers, which in turn optimises the condenser performance and increases the longevity of condensers,” Mac Donald adds. Copper pipes were used throughout for the refrigerant piping. All the evaporator coils were designed by EP Engineering and supplied by HC. These were fitted with Danfoss electronic expansion valves to control refrigerant flow and room temperature. Holding room. 50 explains Mac Donald. The four pulldown rooms are designed to pull down 30 pallets of mangoes from 30⁰C to 8⁰C in 24 hours,” he explains. The blueberry pull down room is designed to cool down four pallets of product from 30⁰C to 6⁰C in one hour. Energy Partners supplied and installed all refrigeration equipment for the Estate. RACA Journal I March 2020 TICKING ALL THE BOXES Despite the tight deadline Energy Partners had to meet, the team was also faced with designing multipurpose rooms – thus making design challenging. “Three of the rooms, (Rooms 11-13) are designed to de-green mangoes and citrus at 21⁰C and precool mangoes to 8⁰C. When de-greening, CO 2 needs to be removed from the rooms, RH kept at 90% and ethylene www.hvacronline.co.za