Projects equipment had to be specified to survive being exposed to the harsh -20°C conditions during transport. Planning had to be meticulous as literally everything had to be taken there (no quick going back). From the ducting to the FCUs and everything in-between had to be included. HVAC equipment that could not be built locally was imported from Germany and sent to Cape Town, from where it was shipped to Antarctica. From there it was lifted onto the ice bank by crane and then hauled with a sleigh through the snow and ice to the base. But not only did the planning have to include getting all the equipment and tools to the base, but also bringing back the old system. Nothing could be left behind. This was quite a tough job, as only 25 people could make the journey to the base and between them, they had to complete all the upgrades — electrical, HVAC, wet services, and so on. As they could only stay for the summer, the crew worked long days to get everything done on time. 48 RACA Journal I January 2019 INSTALLATION DETAILS The following notable design features, energy-saving measures, and latest sustainable technology systems were installed: Engines and heat recovery systems Tier III compliant engines (CAT) were installed, thus ensuring that engines’ NOx emission will be limited in accordance with international standards. Water-to-water heat exchangers on the engine block and air-to-water heat exchangers on the exhaust pipes ensure maximum heat recovery; heat which will normally be rejected to atmosphere. The heat recovery systems increased the typical engine/ system efficiency from ±35% to ±80%. The hot water thus generated is circulated to fresh air FCUs to heat the base and is also used to heat domestic hot water via heat exchangers. Vertically configured, close-coupled centrifugal pumps with www.hvacronline.co.za