RACA Journal January 2019 | Page 49

Projects 4 maintenance/construction teams, food, consumables, fuel, and the like is limited to the Antarctic summer of each year. Systems and equipment had to be easily maintainable, and previous problems experienced with systems had to be addressed. For example, a typical problem experienced is the loading of the old effluent plant between takeovers (10 people during the year versus the summer staff complement of about 90 people). GETTING STARTED Following a status quo investigation and lengthy planning, DPW and Royal HaskoningDHV completed the refurbishment documentation process early in 2015. The existing workshop was identified as the new main plant room. The workshop was temporarily moved to the hangar while the new generator sets, pumps, tanks, heat exchangers, and so on were installed. The old plant room could only be demolished after the successful commissioning of the new systems. Other systems and plant rooms had to be relocated in a similar way to ensure the uninterrupted operation of the base. One of the biggest challenges was actually getting to the base and getting all the equipment there. As mentioned, SANAE IV can only be reached during the Antarctic summer season; either via the S.A. Agulhas ship departing from Cape Town and offloading at the German base, Neumayer; or by plane, landing at the Russian base, Novolazarevskaya, with a second flight (smaller plane) from there to SANAE IV. The www.hvacronline.co.za RACA Journal I January 2019 47