RACA Journal January 2019 | Page 34

Feature IMPLEMENTATION OF BIM FROM A CONSULTANT’S DESIGN PERSPECTIVE By Craig Blankers of WSP In the South African context, building information modelling (BIM) is rapidly gaining traction due to technological advances and the availability thereof — how can this benefit the HVAC&R consultant? T he competition in the built environment between capital investors, professional design consultants, and construction contractors is linearly increasing due to population and resource demands globally. To obtain a competitive advantage, professional teams are continuously searching for more efficient techniques to complete projects with minimal complications and for the most desirable combination of cost, quality, and project completion time. Through the use of BIM, professional teams are able to communicate more effectively in the planning, design, construction, operation, and maintenance phases, with the addition of predetermined accessibility to relevant contractual documentation uploads through a common data environment (CDE). ADVANTAGES OF BIM one process. Architects, engineers, and professional team members are becoming more proficient and advanced in BIM as the implementation on projects is increasing. According to ASHRAE, the greatest value of BIM is its potential to reduce project costs, increase productivity from the design and implementation process, reduce errors, and improve the overall quality of the work produced and installed in the built environment. It is important to ensure that all team members, be it the professional team or contractors, are proficient in the utilisation and implementation of BIM. CONTRACTORS AND BIM Although contractors are often not involved in the integral design of the building and its systems, their role in the utilisation and implementation of BIM with regard to integrated building design (IBD) may be limited. However, when referring to integrated project delivery (IPD), the contractors place a critical role in the implementation and development thereof. In order to further develop this concept, it is important to fully understand all the elements of BIM. A flow chart depicting the progression from and a visual representation of each stage is given in Figure 1. The conventional workflow of the construction industry is being disrupted through the advances of intelligent architectural and engineering design models. These intelligent design models, through the use of BIM, aid in the reduction of project costs and time, and enhance installation quality through various workflow packages integrated into a CDE. As a result of a CDE, a platform to promote stakeholder collaboration is created by enhancing communication through the digitisation of information sharing and documentation. The advantages of BIM are becoming clearer to professional team members who are using the software adequately, and internal processes are being optimised from all design facets. The benefits of professional team members using BIM from a design perspective eliminates the need for designers to work in silos, as coordination of services is no longer an afterthought. Designers are able to upload multidisciplinary services on a live model and design their individual systems to suit, as opposed to designing in two-dimensional plan views and coordinating services afterwards. The time saved from the design perspective is invaluable as the design and coordination processes are amalgamated into Figure 1: Transition from 2D to 6D. 32 RACA Journal I January 2019 www.hvacronline.co.za