RACA Journal January 2019 | Page 33

Feature By sizing a plant room correctly with the help of BIM, a plant can be made smaller and thus plant rooms can be better designed. planning or understanding what BIM can deliver; and not understanding what the client wants to gain from the BIM process. “Unfortunately, building owners in this country are slow to realise the benefits and most of the BIM benefits,” says Henning. “Therefore, it sits with the professionals and perhaps with some contractors (for now) to drive this.” Currently, a good few engineering companies in South Africa have realised the benefits and have adopted a BIM culture, both for domestic and international offices, and have engaged in the BIM process on their projects. “The best way forward is to receive the correct education in BIM. There are many software vendor companies that provide less accurate information on BIM and by doing so have done the industry no favour,” says Henning. Make sure you get training from the right sources, like the BIM Institute itself. TRENDS So, where are we going? “We are seeing a much greater use of the technology to allow the off-site prefabrication of components of the building so that these are installed almost immediately before the super structure of the building is complete (before the building is enclosed),” says Allen. By doing this, buildings can be erected much quicker and also more accurately, while also addressing challenges such as welding on site, which carries with it hot works risks, including fire and burns to other workers (who are therefore required to remain outside a safe zone around those works). www.hvacronline.co.za The welds are then more accurate and less issues arise at commissioning with the systems not meeting the required pressure or flow rate as per the design. Also, these components can be delivered by section and erected immediately, providing better security of the product, which can otherwise be quite worthwhile to be stolen from site. This assists installation teams, as components can be grouped and radio-frequency identification (RFID) tagged to track installation against a model, according to Allen. FUTURE OF BIM “As more professionals understand the benefits both for design and fabrication (including installation), we will see a much greater uptake on the software side, while those responsible for the management of these packages of work will find young supervisors coming through who want to do things differently and who can push the implementation at that level,” explains Allen. A WORD OF ADVICE Never try do an entire project when you first start in BIM, Allen advises. Gradually increase the scope and level at which the technology is implemented, as it takes time to train the people and get them to gain the most out of it. “Going too fast only creates more resistance from those tasked with implementation, which will negatively affect the further implementation.” RACA RACA Journal I January 2019 31