City Hall Field Trip Days
Public Works values the chance to connect with our young residents and students to inform them about our contributions to the community.
Recently, students from various schools and home schools in Port St. Lucie participated in City Hall Field Trip Days. Public Works showcased two pieces of equipment used in our operations.
Public Works celebrates City’ s anniversary
Our staff engaged with the students and answered questions about drainage and traffic in the City.
The PSL 65 Celebration brought together residents and City staff, including Public Works, for a day of meaningful interaction and education.
Our team was thrilled to connect with people who stopped by our booth to learn more about drainage and swale maintenance. The highlight was our hands-on stormwater model, which demonstrated the effects of a blocked swale system and sparked insightful conversations about neighborhood drainage.
Roadway Resurfacing Projects www. cityofpsl. com / repaving
The Capital Improvement resurfacing goal for FY 2025-26 is 18.95 miles with 10.28 miles completed to date. Residents will be notified in advance of resurfacing.
Sandpiper Bay( West): Complete Lyngate: Complete Torino( E. Torino) North: Complete Floresta Pointe( East): Complete Hidden Oaks( West): Complete Sandhill Crossing( Tiffany): Complete Northport Village( North): Scheduled Rosser Reserve / Gatlin Pines: Scheduled Hidden Oaks( Import): Pending Schedule
www. CityofPSL. com / PublicWorks
48 ON THE
PSL PULSE