1.1.8.2 Primary injection Method:
This method usually employees on switchgear bar CTs and
outdoor CTs
Circuit diagram
1.1.7.2.1 Method:
1 st of all off the breaker
Check the zero voltage state by high voltage tester ,
also earthed the dead circuit
Now short your incoming side red, yellow and blue
phase primary conductor
Place one ammeter (digital will be good) in neutral or
star point of CTs secondary. Make sure test block
cover must be removed, so you can ensure the circuit
completed within CT loop, no need to involve Relay in
circuit.