1.1.8.2 Primary injection Method: This method usually employees on switchgear bar CTs and outdoor CTs Circuit diagram 1.1.7.2.1 Method:  1 st of all off the breaker  Check the zero voltage state by high voltage tester , also earthed the dead circuit  Now short your incoming side red, yellow and blue phase primary conductor  Place one ammeter (digital will be good) in neutral or star point of CTs secondary. Make sure test block cover must be removed, so you can ensure the circuit completed within CT loop, no need to involve Relay in circuit. pg. 26