Plumbing Africa September 2019 | Page 50

48 PROJECT Kwikot 300ℓ system with 7Kw heat pump on a 2-bedroom chalet. the design specs given by the consulting engineers. “Some minor changes were made to keep the local fire chief happy and be in line with the SANS codes. (It was nice to see someone other than a plumber having his SANS codes on hand to point out potential issues that could arise). At each completion of a phase of the project, the local fire chief and building inspector was on hand to inspect works carried out and to ensure we were within the set guidelines.” www.plumbingafrica.co.za @plumbingonline @plumbingonline • Borehole water to supply all water closets (WCs) at Knysna Hollows: “As per our client request, the borehole water was pumped into storage tanks and filtered after which it was pumped into a separate supply ring main that provides water to fill all the WC on site. In the event of a break in the water supply, this water can be diverted into the potable water ring main, thereby ensuring a continued supply of water and continuation of operations.” @PlumbingAfricaOnline September 2019 Volume 25 I Number 7