Plumbing Africa August 2019 | Page 18

16 DESIGN: DEAR MR PLUMBER Complying with drainage regulations and 4IR thinking “A typical We have three options of how to comply with the seven sanitary example of this drainage regulations. rigid thinking By By Vollie Brink, Pr Eng and lack of the exact words were that it was meant to always be There are only seven sanitary drainage regulations adaptability is in SANS 10400-P, and these are Part 1 to Part 7. used, “so that you do not need an engineer for a house design”. with the older Part 2 is the important technical design regulation to This too is old news, but I want you to just take a which the design and installation must comply and generation is inherently a description of how the system must moment and think how this will affect the 4th industrial revolution, the so-called 4IR. I wrote an article for another function. It is the cornerstone of the deem-to-satisfy-rule who frantically (DTSR) design, but also the basis of the rational design engineering magazine about 4Ir that will affect the future of all of us. (RD). It is also the Agrément Certification for design cling to the and construction, if someone has such a design and This 4IR is not still coming, it is already here and it construction solution. These performance regulations are regulations and in Annex A, and B. seems it will be mostly electronic development and intelligent high-tech that could perhaps even replace specifically the The choice of which design solution to use is at the choice much of your and my work, however, at my age I am not concerned too much, but you should perhaps be more of the owner, but the Building Control Officer also has ‘rules’.” a choice and may require a rational design if he or she concerned, in a positive way, as it should give you more www.plumbingafrica.co.za deems it necessary due to complexity, or any other reason that deems it necessary. scope and opportunities, and even a better world to live in (I hope!). If you carefully study the DTSR, you will see that it is basically a recipe for housing and offices, and it does not pertinently address buildings such as hospitals, hotels, shopping centres and industrial buildings. This is where the RD comes in. I know you may tell me that all of this is old news to you, but what I want to discuss in this article is something related to all of this. 4IR cannot happen without change, progress, renewal, innovation, and thinking out-of-the-box. Stagnation will prevent you from participating in the 4IR race and it is developing at an exponential rate. What took years to develop is now progressing at phenomenal rates and if you want to be part of it, you must wake up with new thinking and be willing to change or stay behind. I find that many in the plumbing trade are not willing to adapt and change. The DTSR design and construction recipe was specifically developed for the plumber or architect, and There is an old saying, ‘adapt or die’, and now is the time to adapt. My concern is that so many people use @plumbingonline @plumbingonline @PlumbingAfricaOnline August 2019 Volume 25 I Number 6