Parks & Recreation Annual Report FY 17/18 | Page 24
FY 1
8/1
9
Futu
Proj re
ects
LIST OF FUTURE PROJECTS
Community Center
•
•
•
•
•
•
•
Replace the generator exhaust pipe
Painting of the Community Center exterior
Auditorium retrofit LED lighting
Fire alarm panel replacement
Lake fountain with light feature
Pool table replacement (4)
Re-charge well
Robert E. Minsky Gym
• Security camera upgrade
• Vinyl panels (Add and repair to the current
panels)
• Repaint the gymnasium lines
• Parking lot repairs
21
Civic Center Recreation
• Update basketball gym wall mats with wall
reinforcement
• Replace carpet in Tot Room
• Re-formica Recreation Desk
• Repaint the gymnasium lines
• Replace two pool tables
Parks
•
•
•
•
Addition of a new dog park at McChesney Park
Design/Build of Winterlakes Park
Expanded parking lot at Jessica Clinton Park
Upgraded lighting system and security cameras
at Jessica Clinton Park
• Park security cameras at Veterans Park at
Rivergate
• Pedestrian trails at Woodland Trails Park
• Replacement of the baseball concession building
at Whispering Pines Park