Our Plans for 2021/22 | Page 49

Project ID
Urban / Rural
Asset work type
Project name
Project type
Local area
Indicative scope
Start End Length
Cost estimates
($)
1.3aa
Urban
Upgrade
Regional Footpath Improvement
Footpaths
Project
Regional
1.3ab
Urban
Renewal
( 1 ) McDowall Street - Roma
Footpaths
Roma
42m
Outdoor Sports to Charles
Street
1.3ac
Urban
Renewal
( 2 ) McDowall Street - Roma Fire
Footpaths
Roma
60m
Station to Gregory Street
1.3ad
Urban
Renewal
( 3 ) Bowen Street - Wyndham to
Footpaths
Roma
105m
Arthur Street ( northern side )
1.3ae
Urban
New
Surat Riverwalk Stage 2 ( Bridge
Footpaths
Surat
to camping ground )
1.3af
Urban
Upgrade
Upgrade of footpaths - 50
Footpaths
Regional
percent contribution
Connections / Extension - excluded due to requirement to present " minimum / critical " projects only
1.3ag
Rural
Renewal
Dunkeld Road Culvert Replacement
Rural
Upgrade
Concrete culvert - Gunnewin
West Road ( design only )
1.3ah
Rural
Upgrade
Annual Concrete Floodway
Program - 2 x Locations
1.3ai
Urban
Renewal
Stormwater Relining /
Repair Program - including
displacement repairs and
relining of Lovell St / Elanora
Ave
1.3aj
Urban
Upgrade
Bridge Pedestrian Handrail
Replacement Program
1.3ak
Urban
Upgrade
Ivy Street Outlet Protection /
Treatment
1.3al
Urban
Upgrade
Miscamble and Queen Street
Roma - Intersection Upgrade
( 50 % contribution )
1.3am
Urban
New
Long Distance Coach Stop
Program ( People With Disability
Compliance )
1.3an
Urban
Upgrade
Vehicle Rest Area - Eastern
Approach to Roma ( opposite
Big Rig )
Rural drainage / stormwater
Rural drainage / stormwater
Rural drainage / stormwater
Urban drainage / stormwater
Urban drainage / stormwater
Urban drainage / stormwater
Other
Other
Other
Mitchell
Injune
Regional Roma
Regional Roma
Roma
Regional
Roma
332,500
330,000
170,000
968,648
Total capital ( ii ) $ 29,344,180
1.3ao
Urban
Operating
Stormwater Bulk Maintenance Program - including silt removal
1.3ap
Rural
Operating
Hoganthulla / Mt Moffat Road
Intersection ( assist with future
funding applications ) - Design
Only
1.3aq
Urban
Operating
Charles Street ( Bowen to
McDowall ) Widening Project -
Design Only
1.3ar
Urban
Operating
Unsealed Urban Streets within
Priority Infrastructure Area -
Design Only
Urban drainage / stormwater
Strategic planning
Strategic planning
Strategic planning
Regional Mitchell
Roma
Regional
155,000
Total operating ( i ) $ 155,000 Total projects $ 29,499,180
Our plans for 2021 / 22
49