ID Improvement
Construction Cost
Project Cost
Site Improvements 1938000 2398000
1-PRKG Parking Lot 1 Upgrades 4,200 2-PRKG Parking Lot 2 Upgrades 2,200 2 ' -PRKG Parking Lot 2 ' Upgrades 54,600 4-PRKG Parking Lot 4 Upgrades 5,500 5-PRKG New Parking Lot 5 816,000 5-SHADE Fabric Shade Canopy 19,700 6-PRKG New Bus Drop Off Lot 6 262,300 7-PRKG New Parking Lot 7 606,200 AMP Amphitheatre Shade 65,600 FENCE-S South Fencing , Ornamental Fencing and Mow Strip 58,300
FIRE
Connect Fire Main to City Water Main . Remove from Storage Water Tank system . Install Post Indicator Valve , Double Backflow and Fire Alarm Tamper / Flow Switches . ( 2017 )
21,900
SIGNAL Install Cross-Walk Signal at Flint Ave . Crossing 21,900
ID |
Improvement |
Construction Cost |
Project Cost |
Community Improvements |
2374000 |
2936000 |
FH-1 |
" COMMUNITY Field House Building FH-1 . Unisex Toilets / Changing & Storage
Bays . Concrete Block , 2,300 SF , 14-feet ceilings ."
|
921,700 |
|
" COMMUNITY Field House Building FH-2 . Maker Space / Think Room . Computers |
641,200 |
FH-2 |
, Counters and Storage Cabinets . Concrete Block , 1,600 SF , 14-feet ceilings ." |
|
|
" 1 ) Move Basketball Backstops , 12 locations |
86,800 |
P-COURT |
2 ) Seal and Restripe Pavement , 50,000 SF 3 ) Add Basketball Nets " |
|
P-DRINK |
Filtered Water Fountains at 3 locations |
15,300 |
P-SHADE " Metal Shade Canopies . Two ( 2 ), 30 ' x 60 '" 209,800 T-900 " Grandstand / Bleachers 900 seats " 109,300 T-SHADE " Fabric Shade Canopies Five ( 5 ), 30 ' x 30 '" 98,400
T-400M
" 400-Meter Track Upgrades 1 ) Widen Track from 7-meters to 10-meters wide ( 7 to 8 lanes ) 2 ) Add 15,300 SF of Track Clay Surface 3 ) Regrade in-field turf , adjust sprinklers & re-seed . 4 ) Remove Football Posts and Stripe turf for Soccer 5 ) Improve existing in-field drainage system at perimeter 6 ) Remove ( E ) Concrete curbs and gutters and replace with a new 48 "" wide concrete walk around outside edge of track and a 24 "" wide inside apron ( 6 "" Curb + 18 "" V-Gutter ). 9,000 SF of 4 "" Thick Concrete ( 3,000 CF ). 7 ) Add 5 "" thick concrete pad for bleachers . 4,700 SF ( 2,000 CF ) 8 ) Add Grandstand / Bleachers , 900 seats . 9 ) Add concrete walk between basketball court . 2,100 SF ( 700 CF ) 10 ) New eastern chain link fence x 8 ' tall ; move 4-feet to the east . 650-LF 11 ) Adjust eastern property line to the east by 5-feet ."
291,400
Totals 10,512,000 13,004,000