Livingston Middle School
Section Three
F a c i l i t y A s s e s s m e n t s
Livingston Union School District | Facilities Master Plan
Livingston Middle School
ID Improvement
Construction Cost
Project Cost
Site Improvements 1938000 2398000
1-PRKG Parking Lot 1 Upgrades 4,200 2-PRKG Parking Lot 2 Upgrades 2,200 2 '-PRKG Parking Lot 2 ' Upgrades 54,600 4-PRKG Parking Lot 4 Upgrades 5,500 5-PRKG New Parking Lot 5 816,000 5-SHADE Fabric Shade Canopy 19,700 6-PRKG New Bus Drop Off Lot 6 262,300 7-PRKG New Parking Lot 7 606,200 AMP Amphitheatre Shade 65,600 FENCE-S South Fencing, Ornamental Fencing and Mow Strip 58,300
FIRE
Connect Fire Main to City Water Main. Remove from Storage Water Tank system. Install Post Indicator Valve, Double Backflow and Fire Alarm Tamper / Flow Switches.( 2017)
21,900
SIGNAL Install Cross-Walk Signal at Flint Ave. Crossing 21,900
ID |
Improvement |
Construction Cost |
Project Cost |
Community Improvements |
2374000 |
2936000 |
FH-1 |
" COMMUNITY Field House Building FH-1. Unisex Toilets / Changing & Storage
Bays. Concrete Block, 2,300 SF, 14-feet ceilings."
|
921,700 |
|
" COMMUNITY Field House Building FH-2. Maker Space / Think Room. Computers |
641,200 |
FH-2 |
, Counters and Storage Cabinets. Concrete Block, 1,600 SF, 14-feet ceilings." |
|
|
" 1) Move Basketball Backstops, 12 locations |
86,800 |
P-COURT |
2) Seal and Restripe Pavement, 50,000 SF 3) Add Basketball Nets " |
|
P-DRINK |
Filtered Water Fountains at 3 locations |
15,300 |
P-SHADE " Metal Shade Canopies. Two( 2), 30 ' x 60 '" 209,800 T-900 " Grandstand / Bleachers 900 seats " 109,300 T-SHADE " Fabric Shade Canopies Five( 5), 30 ' x 30 '" 98,400
T-400M
" 400-Meter Track Upgrades 1) Widen Track from 7-meters to 10-meters wide( 7 to 8 lanes) 2) Add 15,300 SF of Track Clay Surface 3) Regrade in-field turf, adjust sprinklers & re-seed. 4) Remove Football Posts and Stripe turf for Soccer 5) Improve existing in-field drainage system at perimeter 6) Remove( E) Concrete curbs and gutters and replace with a new 48 "" wide concrete walk around outside edge of track and a 24 "" wide inside apron( 6 "" Curb + 18 "" V-Gutter). 9,000 SF of 4 "" Thick Concrete( 3,000 CF). 7) Add 5 "" thick concrete pad for bleachers. 4,700 SF( 2,000 CF) 8) Add Grandstand / Bleachers, 900 seats. 9) Add concrete walk between basketball court. 2,100 SF( 700 CF) 10) New eastern chain link fence x 8 ' tall; move 4-feet to the east. 650-LF 11) Adjust eastern property line to the east by 5-feet."
291,400
Totals 10,512,000 13,004,000
43