Section Three
F a c i l i t y
Livingston Union School District | Facilities Master Plan
A s s e s s m e n t s
Livingston Middle School
ID
Construction
Cost
Improvement
Building Site and Community Improvements
Building Improvements
A-BLINDS
"Replace existing window exterior blinds on south face.
Motorized with controls. Total of 3 Blinds"
A-LED
"Replace lights with LED Fixtures and motion sensors.
30 Fixtures"
A-SEAL
Apply Sealer to existing Brick and Masonry wall surfaces, 10,000 SF
B-REMOD
"Building B Admin Remodel. 4,400SF TOTAL, 4.6 sf/pupil"
1,282,300
C-REMOD
"Bldg C Library Remodel. Remodel to include ""Think Center""
4,300SF TOTAL = 4.6 sf/pupil"
1,253,200
C-RR
Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 650
SqFt
D-CONC
ADA Concrete Upgrades around Building D, 800 SF
D-WASH
"Upgrade exterior kitchen wash-out area and concrete. 200 SqFt of Concrete,
Plumbing Fixture and Wall Tile."
D-STAGE
"Install Stage Curtain at back of stage for cross-over space. 40 LF"
D-REMOD
"Remove office and practice room wall to increase overall room size.
Polished Concrete Floor, Wall & Ceiling Finishes, LED Lights, HVAC Unit.
1,600 SF"
D1
Music Room Addition, 1,800. Office, 2 Practice Rooms, Library, Music Storage
Cabinets
D1-YARD
Exterior Storage Yard, 540 SF
E-RR
Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and
Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted
Ceiling 800 SF
G-BLINDS
"Install interior blinds at clearstory windows. G2-g7, three (3) Window Each
Requires motorized controls"
G-SHADE
"Metal Shade Canopies. Two (2), 30' x 60'
Concrete Walks, 7,200 SF"
398,700
G-RR
Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and
Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted
Ceiling 700 SF
127,500
G-IDF
"Create an Technology IDF Room 10' x 10' inside of an existing storage
room. Requires ODU / IDU Cooling."
29,100
H-RR
Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 800
SF
145,700
DOORS
"Remove and replace exterior hollow metal doors and hardware, 10 locations"
21,900
PAINTING
"Exterior Wall Painting. Paint Cement Plaster Soffits and Walls (above brick)
Buildings B through K"
SEAL
"Exterior Wall Sealers. Apply Sealer to existing Brick and Masonry wall surfaces.
Buildings B through K"
50,400
FANS
Remove and Replace all exhaust fans in toilet rooms. 10 locations.
14,600
6,600
Project
Cost
10,512,000
13,004,000
6,200,000
7,670,000
ID
TECH-IDF
"Technology, IDF Room Cooling. Install a cooling system at the technology IDF
cabinet locations. Provide dedicated electrical power circuits and a battery
back-up UPS system. Quantity: 4 locations at each school site. "
21,900
TECH-HC
"Technology, Horizontal Cabling Replace the Horizontal Cabling system between the Intermediate Distribution Frame and the data drops. Cat-6e cable at
1-1/4"" pathway, or Cat-6 if pathway is 3/4.” “Quantity: 40% of the campus, or 5
Drops per Classroom."
218,600
TECH-SC
"Technology, Structured Cabling. Replace the Structured Cabling system between the school site Main Distribution Frame and the utility service provider.
Quantity: Fiber Optic Cables 12-MMC / 12-SMC, and a 25 Pair twisted cable
copper backbone"
36,400
VIDEO
"Provide a Video Surveillance system at the campus. Two (2) Cameras for each
permanent buildings. No cameras at portables."
58,300
P.A.
"Add new Public Address system. Speakers in all Classrooms and occupied
spaces. 80 Interior Speakers & 10 Exterior Horns"
218,600
F.A.
Replace Fire Alarm System
291,400
13,100
8,400
118,400
Construction
Cost
Improvement
Project
Cost
9,300
10,900
7,000
466,300
1,049,200
31,500
145,700
39,300
125,900
42