LUSD Facilities Master Plan | Page 44

Section Three F a c i l i t y Livingston Union School District | Facilities Master Plan A s s e s s m e n t s Livingston Middle School ID Construction Cost Improvement Building Site and Community Improvements Building Improvements A-BLINDS "Replace existing window exterior blinds on south face. Motorized with controls. Total of 3 Blinds" A-LED "Replace lights with LED Fixtures and motion sensors. 30 Fixtures" A-SEAL Apply Sealer to existing Brick and Masonry wall surfaces, 10,000 SF B-REMOD "Building B Admin Remodel. 4,400SF TOTAL, 4.6 sf/pupil" 1,282,300 C-REMOD "Bldg C Library Remodel. Remodel to include ""Think Center"" 4,300SF TOTAL = 4.6 sf/pupil" 1,253,200 C-RR Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 650 SqFt D-CONC ADA Concrete Upgrades around Building D, 800 SF D-WASH "Upgrade exterior kitchen wash-out area and concrete. 200 SqFt of Concrete, Plumbing Fixture and Wall Tile." D-STAGE "Install Stage Curtain at back of stage for cross-over space. 40 LF" D-REMOD "Remove office and practice room wall to increase overall room size. Polished Concrete Floor, Wall & Ceiling Finishes, LED Lights, HVAC Unit. 1,600 SF" D1 Music Room Addition, 1,800. Office, 2 Practice Rooms, Library, Music Storage Cabinets D1-YARD Exterior Storage Yard, 540 SF E-RR Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 800 SF G-BLINDS "Install interior blinds at clearstory windows. G2-g7, three (3) Window Each Requires motorized controls" G-SHADE "Metal Shade Canopies. Two (2), 30' x 60' Concrete Walks, 7,200 SF" 398,700 G-RR Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 700 SF 127,500 G-IDF "Create an Technology IDF Room 10' x 10' inside of an existing storage room. Requires ODU / IDU Cooling." 29,100 H-RR Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Clean Floor Tile, Electric Hand Dryers, Painted Ceiling 800 SF 145,700 DOORS "Remove and replace exterior hollow metal doors and hardware, 10 locations" 21,900 PAINTING "Exterior Wall Painting. Paint Cement Plaster Soffits and Walls (above brick) Buildings B through K" SEAL "Exterior Wall Sealers. Apply Sealer to existing Brick and Masonry wall surfaces. Buildings B through K" 50,400 FANS Remove and Replace all exhaust fans in toilet rooms. 10 locations. 14,600 6,600 Project Cost 10,512,000 13,004,000 6,200,000 7,670,000 ID TECH-IDF "Technology, IDF Room Cooling. Install a cooling system at the technology IDF cabinet locations. Provide dedicated electrical power circuits and a battery back-up UPS system. Quantity: 4 locations at each school site. " 21,900 TECH-HC "Technology, Horizontal Cabling Replace the Horizontal Cabling system between the Intermediate Distribution Frame and the data drops. Cat-6e cable at 1-1/4"" pathway, or Cat-6 if pathway is 3/4.” “Quantity: 40% of the campus, or 5 Drops per Classroom." 218,600 TECH-SC "Technology, Structured Cabling. Replace the Structured Cabling system between the school site Main Distribution Frame and the utility service provider. Quantity: Fiber Optic Cables 12-MMC / 12-SMC, and a 25 Pair twisted cable copper backbone" 36,400 VIDEO "Provide a Video Surveillance system at the campus. Two (2) Cameras for each permanent buildings. No cameras at portables." 58,300 P.A. "Add new Public Address system. Speakers in all Classrooms and occupied spaces. 80 Interior Speakers & 10 Exterior Horns" 218,600 F.A. Replace Fire Alarm System 291,400 13,100 8,400 118,400 Construction Cost Improvement Project Cost 9,300 10,900 7,000 466,300 1,049,200 31,500 145,700 39,300 125,900 42