Section Three
F a c i l i t y
Livingston Union School District | Facilities Master Plan
A s s e s s m e n t s
Selma Herndon Elementary School
ID
Construction
Cost
Improvement
Site Improvements
2,897,000
1-PRKG
Parking Lot 1 Reconfiguration
466,300
2-PRKG
Parking Lot 2. Seal and Stripe
116,600
3-PRKG
Parking Lot 3. New Parking Lot and entrance
979,200
AMP
Amphitheater
293,800
A-SHADE
Metal Shade Structure. 30' x 60'
104,900
B-FENCE
Relocate Chain Link Fence at Kindergarten Yard. 276 LF (2017)
36,200
B-SHADE
Fabric Shade Structure over Play Equipment. 30 x 30.
19,700
Cr-GATES
Upgrade Gates for Accessibility. 3 Locations (2017)
15,300
EY-POWER
Replace Electrical Switchgear, and Feeders back to Building Panels
FENCE-N
Ornamental Iron Fence, Concrete Mow Strip
14,600
FENCE-S
Chain Link Fence, 6-Feet tall, mow-strip, 2" Mesh. 175 LF
25,500
GATE-N
"Pedestrian Entrance Gate with Electronic Locks and Video Surveillance"
10,900
GATE-V
"Motorized sliding gates with access controls. For use by District Fleet and
School Site Teachers"
21,900
P-COURT
"1) Move Basketball Backstops, 12 locations 2) Seal and Restripe Pavement,
50,000 SF 3) Add Basketball Nets"
6,700
PLAY-1
Play Area 4,500 SF, with new Play Structure, 30x30 Fabric Shade Canopy and
Seating
228,100
PLAY-2
Play Area 4,500 SF, with new Play Structure, 30x30 Fabric Shade Canopy and
Seating
228,100
P-COURT
"1) New Basketball Backstops, 8 locations 2) Pavement, 18,000 SF, with 100
LF Concrete Curb & 225 LF Concrete V-Gutter"
183,600
Project
Cost
3,584,000
ID
Construction
Cost
Improvement
Community Improvements
T-300M
Totals
"300-Meter Track. 7-meters Wide with 18,000 SF of Track Clay Surface. Regrade
in-field turf, adjust sprinklers & re-seed, 62,000 SF. Field drainage system at
perimeter and 7,500 SF of 4"" Thick Concrete "
175,000
Project
Cost
216,000
174,900
23,466,000 29,027,000
145,700
31