LUSD Facilities Master Plan | Page 33

Section Three F a c i l i t y Livingston Union School District | Facilities Master Plan A s s e s s m e n t s Selma Herndon Elementary School ID Construction Cost Improvement Site Improvements 2,897,000 1-PRKG Parking Lot 1 Reconfiguration 466,300 2-PRKG Parking Lot 2. Seal and Stripe 116,600 3-PRKG Parking Lot 3. New Parking Lot and entrance 979,200 AMP Amphitheater 293,800 A-SHADE Metal Shade Structure. 30' x 60' 104,900 B-FENCE Relocate Chain Link Fence at Kindergarten Yard. 276 LF (2017) 36,200 B-SHADE Fabric Shade Structure over Play Equipment. 30 x 30. 19,700 Cr-GATES Upgrade Gates for Accessibility. 3 Locations (2017) 15,300 EY-POWER Replace Electrical Switchgear, and Feeders back to Building Panels FENCE-N Ornamental Iron Fence, Concrete Mow Strip 14,600 FENCE-S Chain Link Fence, 6-Feet tall, mow-strip, 2" Mesh. 175 LF 25,500 GATE-N "Pedestrian Entrance Gate with Electronic Locks and Video Surveillance" 10,900 GATE-V "Motorized sliding gates with access controls. For use by District Fleet and School Site Teachers" 21,900 P-COURT "1) Move Basketball Backstops, 12 locations 2) Seal and Restripe Pavement, 50,000 SF 3) Add Basketball Nets" 6,700 PLAY-1 Play Area 4,500 SF, with new Play Structure, 30x30 Fabric Shade Canopy and Seating 228,100 PLAY-2 Play Area 4,500 SF, with new Play Structure, 30x30 Fabric Shade Canopy and Seating 228,100 P-COURT "1) New Basketball Backstops, 8 locations 2) Pavement, 18,000 SF, with 100 LF Concrete Curb & 225 LF Concrete V-Gutter" 183,600 Project Cost 3,584,000 ID Construction Cost Improvement Community Improvements T-300M Totals "300-Meter Track. 7-meters Wide with 18,000 SF of Track Clay Surface. Regrade in-field turf, adjust sprinklers & re-seed, 62,000 SF. Field drainage system at perimeter and 7,500 SF of 4"" Thick Concrete " 175,000 Project Cost 216,000 174,900 23,466,000 29,027,000 145,700 31