LUSD Facilities Master Plan | Page 27

Section Three F a c i l i t y Livingston Union School District | Facilities Master Plan A s s e s s m e n t s Campus Park Elementary School ID Construction Cost Improvement Site Improvements 2,959,000 1-PRKG Parking Lot 1 Reconfiguration 151,500 2-PRKG Parking Lot 2 Reconfiguration 419,700 3-PRKG Parking Lot 3 373,000 4-PRKG 8th Street, Off Site Drop Off Lane 86,300 5-PRKG H Street, Off Site Drop Off Lane 58,300 1-COURT Play Court 1 relocated to a new location 23,300 1-SHADE Play Area 1 Fabric Shade Structure 19,700 2-PLAY Play Area 2 relocated to new location with Fabric Shade Structure 149,000 AMP Amphitheater 163,500 A-CONC Building A concrete walks. Remove and replace 58,300 A-GATE Main Entrance Gate and Entry 10,300 A-TURF Remove concrete walks and increase turf area. 28,400 A-SHADE Two (2) Metal Covered Shade Structures. B-YARD Kindergarten Play Yard remodel C-CONC Building C concrete walks. Remove and replace 58,300 D-CONC Building D concrete walks. Remove and replace 78,100 E-CONC Building E concrete walks. Remove and replace 46,600 FNCE-E6 Replace Eastern Chain Link Fence, 6-Feet Tall x 2" Fence Fabric and Concrete Mow Strip. 23,300 FNCE-E8 Replace Eastern Chain Link Fence, 8-Feet Tall x 1" Fence Fabric and Concrete Mow Strip. 14,600 FNCE-N8 Replace Northern Chain Link Fence, 8-Feet Tall x 1" Fence Fabric and Concrete Mow Strip. 94,000 FNCE-W6 Replace Western Chain Link Fence, 6-Feet Tall x 2" Fence Fabric and Concrete Mow Strip. 89,600 FNCE-W8 Replace Western Chain Link Fence, 8-Feet Tall x 1" Fence Fabric and Concrete Mow Strip. 14,600 H-STREET H Street Extension 553,700 P-COURT "1) New Basketball Backstops, 8 locations 2) Pavement, 16,000 SF, with 360 LF Concrete Curb & 180 LF Concrete V-Gutter" 163,200 P-DRINK Filtered Water Fountains at 7 locations. Accessible Hi-Low Drinking Fountains, Cane Rails Project Cost 3,661,000 ID Construction Cost Improvement Community Improvements SB-FIELD Soft Ball Field with back-stop, dug-outs and a set of 5-row bleachers T-300M "300-Meter Track. 7-meters Wide with 18,000 SF of Track Clay Surface. Regrade in-field turf, adjust sprinklers & re-seed, 62,000 SF. Field drainage system at perimeter and 7,000 SF of 4"" Thick Concrete " Totals Project Cost 204,000 252,000 14,890,000 18,419,000 29,100 174,900 100 246,300 35,700 25