July/August 2020 | Página 27

Included among the repairs was the limestone façade, roof shingles, exterior siding, gutters and downspouts. Parts of the building were repainted. The outdoor patio was replaced and the new patio includes a water drainage system running underneath the concrete that allows for rainwater drainage to run away from the building. The mold remediation and cosmetic repairs on the inside of the building occurred during the second phase of the renovations in 2020. JULY/AUGUST 2020 | PENNSYLVANIA DENTAL JOURNAL 25