IN Norwin Fall 2025 | Page 39

North Huntingdon Township 2025 Road Paving Program
North Huntingdon 2025 Road Improvements

North Huntingdon Township 2025 Road Paving Program

Our Road Paving Program starts with an initial assessment from our Roadbotics software. Roadbotics uses artificial intelligence to analyze the condition of our roads based on visual input data from a camera and assigns each road a grade. The Township Senior Project Engineer and the Director of Public Works then review the analysis and group unsatisfactory condition roads together based on location and formulate a longterm, 5-year plan.

North Huntingdon 2025 Road Improvements

In early September, Tresco Paving Corporation started the milling and resurfacing work in Wards 6 and 7 of the Township. Prior to milling and resurfacing, our Public Works employees upgraded and repaired all existing road infrastructure to ensure the longevity of the newly paved roadways. The roads scheduled for milling and resurfacing include:
• CAMP STREET
• HALL DRIVE
• WHITE STREET
• SHANNON STREET
• RAILROAD STREET
• ARMSTRONG STREET
• GORDON STREET
• TAYLOR DRIVE
• CLOVER LANE
• SCOTTY ROAD
• FOREST DRIVE
• CASE STREET
• HARTFORD DRIVE
• KENSCOTT DRIVE
• GLENDALE DRIVE
• BRICKNER STREET
• BONNIE DRIVE
• LOGAN ROAD
• EAST STREET
• SARAH COURT
• FROG ROAD( SECTION NEAR RECENT SLIDE REPAIR)
• SCHOOL HILL ROAD

• WOODSIDE DRIVE orth Huntingdon

NORTH HUNTINGDON TOWNSHIP NEWS
The following roads will receive asphalt-leveling course in preparation for a synthetic fiber seal course:
• RICE LANE
• BLAIR LANE
• MASTERS LANE EXTENSION
• PINE HOLLOW ROAD
• MURRYSVILLE ROAD
• MASTERS LANE
• LILLER LANE
• LENTZ LANE
• MAHAFFEY HILL ROAD
• IRWIN AVENUE
• WINCHESTER ROAD
• SCOTCH HILL ROAD NO. 1
• SCOTCH HILL ROAD NO. 2( 2681 SCOTCH HILL 2 TO SCOTCH HILL ROAD)
• WAMPLER LANE
Russell Standard Corporation mobilized at the end of September to perform the synthetic fiber seal course on the above roads prepared by Tresco.
We thank you in advance for obeying all traffic control signs and instructions from our contractors / employees during the improvement of your roads!
NORWIN | FALL 2025 37