On each equipped truck, a RoadGuard unit on the frame measured vertical vibration 100 times a second and tied each reading to the GPS position, giving one quality score for every 20 m of road on every pass
Grading the grader
Maarten Baan and Gert Dam, RoadGuard Solutions; plus Rustam Mahmudovich Ergashev, Nodir Nosirovich Sharipov and Maksim Mamasalievich Hasanov, NMMC, look at the impact of road maintenance at one of the world’ s biggest gold mines
Most open-pit mines grade their haul roads without knowing how well it works. At NMMC’ s Muruntau mine, RoadGuard sensors on the haul trucks track road condition before and after every grade, and the early data suggests graders are returning sooner than the roads need.
Haul road quality is critical to the bottom line
NMMC’ s Muruntau mine in Uzbekistan is one of the largest open-pit gold mines in the world: 120 km of haul roads, more than 180 haul trucks and 13 graders.
A significant portion of a haul truck’ s diesel fuel goes into overcoming rolling resistance, which rises as the road gets soft, rutted or bumpy. Across mines, rolling resistance accounts for 15 to 50 % of the engine work on the haul. Muruntau’ s roads are smooth by mining standards, yet there it still sits in the upper half of that range.
And as rolling resistance limits a loaded truck’ s speed on a climb, road quality will also affect cycle times and therefore total production.
The challenge is knowing, day by day, which road is good, which is not, and where a grader adds the most value.
Why grading is hard to manage
Every day, a mine decides where its graders go, in one of three ways:
• Ad hoc: The grader goes where a driver sees a problem, often once it already hurts productivity;
• Scheduled: Each section is bladed on a fixed rhythm, which overgrades some sections and undergrades others; and
• Managed: Each section is bladed when its condition in combination with its traffic calls for it. This is rarely practised, because it needs an objective, fast and continuous measure of road quality.
At Muruntau, a joint team, the tyre engineer among them, inspects every haul road by eye each Tuesday and lists the sections that need repair in a formal report. The pit-section heads give the grader operators their tasks at the start of each shift; during the shift, drivers’ requests reach them by radio or telephone.
NMMC RoadGuard installation
NMMC partnered with RoadGuard Solutions to test strategically managed grading in daily practice. Trucks have carried RoadGuards since June 2026; graders have been carrying GPS trackers since late July.
“ We have measured everything else in this pit for years,” Anvar Nosirovich Buriev, Deputy Head of the Motor Transport Department of the Central Mining Administration for Road-Construction Machinery at NMMC, said.“ Measuring the condition of the roads every day was the piece we were missing, and it lets us do what we could not do before: run the grader fleet with a strategy instead of the usual routes.”
On each equipped truck, a RoadGuard unit on the frame measures vertical vibration 100 times a second and ties each reading to the GPS position, giving one quality score for every 20 m of road on every pass. It works on any truck brand, is fitted in 45 minutes and records the ride the truck actually feels: instead of a monthly survey, it offers a live view of the haul roads. Load and speed change how hard a truck shakes, so RoadGuard corrects for both: on the same road, a loaded truck climbing at 20 km / h and an empty one descending at 33 km / h read the same roughness to within 1.8 %.
To deploy the grader and repair crew to the right place, the mine needs to know which roads are worst in combination with the traffic they carry. Together the trucks produce one roughness map, graded from A( the smoothest fifth of the network) to E( the roughest fifth).
On the graders, GPS trackers identify grading work by defined movement and repetition patterns. Every stretch of road now has a history: its condition before, the blading and its condition after.
32 International Mining | NOVEMBER / DECEMBER 2026