IM 2020 May 20 | страница 57

IPCC either as single service to assess the asset condition and develop optimisation measures or as frequent and pro-active monitoring of the assets as part of a recurring monthly status assessment reporting. Based on the collected data digital twinning takes place, which confirms considered design data with the data set of the upgrade recommendation, whether it concerns the crushing plant, conveyor, idler or structural steelwork.” Another key argument from miners on the inflexibility of IPCC systems is the challenge of actual equipment and operation in reality. Based on the digital twin for both, crushing plant or conveyor lines, recommendations and statements relocation procedures and preparation. However, Ebert says it must be taken into consideration that there are service providers like thyssenkrupp Industrial Solutions who can take over the shutdown planning and scenario engineering to can be made.” For example, it can be worked out if there are reserves for higher capacities or if there are issues support the mine operator with knowhow to properly deal with this temporary challenge. This would both include the relocation process support at certain conditions (eg during start-up). Based on these recommendations and statements upgrades and revamps can be developed to itself (eg advisory services on the transport crawler operation), but also analytics of the structural integrity and modifications of the increase value of the asset by increasing performance (eg capacity upgrade) or by reducing operational expenditures (eg optimised component selection based on actual conditions). Implementing a digital twin and ongoing collection of relevant data also allows the implementation of equipment to allow its relocation. “The main lever of thyssenkrupp’s involvement nevertheless would be the scenario engineering to ensure a maximum limitation of the operational shutdown plus an predictive maintenance measures which would increase the overall system availability and reliability of operations. “Introducing solution providers like thyssenkrupp Industrial Solutions benefits the assessment of the complete IPCC system by an analysis without prejudice in relation to any specific component or equipment. This allows an open-minded approach to develop the optimum Komatsu launches new IPCC product Komatsu launched a new reclaim feeder model, the Stamler RF-5, at the 2020 CONEXPO-CON/AGG show in Las Vegas earlier this year. Reclaim feeders are a type of chain feeder that transfers material from a stockpile and meters it on to a belt conveyor. The stockpile can be created by a belt conveyor, wheel loader or with a truck dump. Reclaim feeders can also work in a dozer trap configuration. With minimal civil work required for set up, reclaim feeders offer a low installation cost, typically sitting on the ground. They can be easily relocated to be used where most needed, not requiring any special equipment to relocate. They provide an operational flexibility by being able to be dragged into position with dozers. Coal or cement operations, which sell multiple grade products, often use multiple reclaim feeders to blend the products on the belt. They are a low- cost option to back-up bucket wheel reclaimers in a heap-leach application. They can also be utilised in ports for barge and ship loading. More than 500 reclaim feeders have been supplied by Komatsu to implementation of improvements onto the equipment en-route.” Ebert concludes: “Especially when looking into capacity changes in a mine operation, semi-fixed or semi-mobile equipment like those found in date with capacities ranging from 500 to 4,000 tons per hour. To maximise productivity, the fully enclosed, sandwich belt High-Angle Conveyor (HAC) from IPCC systems have a definite potential to apply flexibility to a mine’s operation. There are also measures worth looking at in detail which have the potential to optimise operational expenditures to create increased shareholder value in the long Komatsu is capable of elevating high tonnages of material at steep angles, up to 90°. Komatsu told IM that it recently commissioned its 164th HAC term. system. NOV 9 - 11, 2020, PERTH, WA