Figure 20. Monitoring point photographs of remediated catchments at Sites 8 and 10. LCAT results for these sites are represented by this line and this line respectively in Figure 19.
50
Site 15 LCAT 2 Site 16 LCAT 2 Site 23 LCAT 1 Site 23 LCAT 2
Score #/ 100
Site 24 LCAT 1 Site 24 LCAT 3 – Control Site 18 LCAT 3 Site 18 LCAT 4
Grey line = Controls; Treatment at LCAT is described in the legend.
40
2022 2023 2024
Year Figure 21. Land Condition Assessment scores clustered around 45-50 for the catchments of four Small scale gullies in vertosol soils( Downs Country) following erosion remediation work involving banks to manage overland flows into gullies.
32 GULLY MAINTENANCE AND MONITORING TECHNICAL REPORT