· When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations? · How should the line be redesigned to operate at the initial 250 units per day target, assuming that no overtime will be used? What is the efficiency of your new design? · What other issues might Toshihiro consider when bringing a new assembly line up to speed? =================================================== GSCM 520 Week 4 Quiz
· When it is running at maximum capacity, what is the efficiency of the line relative to its use of labor? Assume that the supporter is not included in efficiency calculations? · How should the line be redesigned to operate at the initial 250 units per day target, assuming that no overtime will be used? What is the efficiency of your new design? · What other issues might Toshihiro consider when bringing a new assembly line up to speed? =================================================== GSCM 520 Week 4 Quiz
FOR MORE CLASSES VISIT www. gscm520rank. com
GSCM 520 Week 4 Quiz
1. Question:( TCO 7) Using the assembly-line balancing procedure, which of the following is the required cycle time in minutes per unit if the daily production time is 480 minutes and the required daily output is 50 units? 2. Question:( TCO 7) Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the eight tasks that make up the job are 7, 4, 7, 8, 9, 4, 3 and 6 minutes and the cycle time is 8 minutes? 3. Question:( TCO 7) Which of the following is not a step in developing a manufacturing cell layout? 4. Question:( TCO 7) Assume a fixed cost for a process of $ 15,000. The variable cost to produce each unit of product is $ 10 and the selling price for the finished product is $ 25. Which of the following is the number of units that has to be produced and sold to break-even?